My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Lochmueller Group Inc - Phase I Design for LWE Corridor Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment to PSA - Lochmueller Group Inc - Phase I Design for LWE Corridor Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:25:46 AM
Creation date
8/15/2018 10:11:32 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. Perform or provide the following additional Preliminary Design Phase tasks or <br />deliverables for the identified project limits and as determined from the Preliminary <br />Design Alternatives analysis. The project limits along Lincoln Way East from the <br />Sample Street to Twyckenham Drive for a total corridor length of approximately 3,970 <br />feet to include: <br />I) Design reconstruction of the north curbline to reduce the roadway width per the <br />Preliminary Design Alternatives analysis <br />2) Design guardrail along Lincoln Way East in accordance with INDOT requirements <br />3) Design necessary drainage improvements for the reconstructed north curbline. <br />Design to include improvements to the existing spillway located approximately 785' <br />west of Twyckenham Drive. Limits of design to be above the ordinary high water <br />mark. Drainage improvements for the existing south curbline are not included. <br />4) Design reconstruction of curb ramp at the NE corner of Sample Street and Lincoln <br />Way East <br />5) Design pavement markings along corridor <br />6) Design Maintenance of Traffic for proposed construction <br />7) Design Erosion Control plans for proposed construction <br />8) Identify construction limits and right-of-way limits required for full build -out of the <br />proj ect. <br />e. Geotechnical services to be provided for analysis of the existing riverbank and soil <br />conditions for the design of a boardwalk on Lincoln Way East. <br />f. Furnish one 1 full size and two 2 11 x 17 review copies of the Preliminary Design <br />Phase documents and any other deliverables to Owner within 14 calendar days of notice <br />to proceed, and review them with Owner. Within 7 calendar days of receipt, Owner shall <br />submit to Engineer any comments regarding the Preliminary Design Phase documents <br />and any other deliverables. <br />2. Engineer's services under the Preliminary Design Phase will be considered complete on the <br />date when the revised Preliminary Design Phase documents, revised opinion of probable <br />Construction Cost, and any other deliverables have been delivered to Owner. <br />B. Final Design â Phase I <br />1. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of <br />probable Construction Cost as determined in the Preliminary Design Phase, and any other <br />deliverables subject to any Owner -directed modifications or changes in the scope, extent, <br />character, or design requirements of or for the Project, and upon written authorization from <br />Owner, Engineer shall: <br />a. Prepare final Drawings and Specifications indicating the scope, extent, and character of <br />the Work to be performed and furnished by Contractor. <br />Page 2 <br />(Exhibit Kâ Amendment to Owner -Engineer Agreement) â Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.