Laserfiche WebLink
This is EXHIBIT K, consisting of 10 pages, referred to in <br />and part of the Agreement between Owner and Engineer for <br />Professional Services dated February 13, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1, Background Data: <br />a. Effective Date of Owner -Engineer Agreement: February 13, 2018 <br />b. Owner: City of South Bend, Indiana Board of Public Works <br />c. Engineer: Lochmueller Group, Inc. <br />d. Project: Lincoln Way East Corridor Improvements Ll17-0SS <br />2. Description, afModifications: <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance with <br />the Agreement and previous amendments, if any, is modified as follows: <br />a. Refer to Exhibit A, Part 1 and add the following: <br />A1.04 ProjeciDesign <br />A. Preliminary Design --- Phase 1 <br />1. Upon written authorization fi-om Owner, Engineer shall: <br />a. Prepare Preliminary Design Phase documents consisting of final design criteria, <br />preliminary drawings, outline specifications, and written descriptions of the Project. <br />b. Advise Owner if additional reports, data, information, or services of the types described <br />in Exhibit B are necessary and assist Owner in obtaining such reports, data, information, <br />or services. <br />c. Based on the information contained in the Preliminary Design Phase documents, prepare <br />a revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />Page 1 <br />(Exhibit K-- Amendment to Owner -Engineer Agreement) —Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />