b. Provide technical criteria, written descriptions, and design data for Owner's use in filing <br />applications for permits from or approvals of govermnental authorities having <br />jurisdiction to review or approve the final design of the Project; assist Owner in <br />consultations with such authorities; and revise the Drawings and Specifications in <br />response to directives from such authorities. <br />c. Advise Owner of any adjustments to the opinion of probable Construction Cost known <br />to Engineer. <br />d. Perform or provide the following additional Final Design Phase tasks or deliverables: <br />1) Final Design Phase deliverables shall be as noted in A1.02 (6). <br />e. Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. Review copies <br />of the Final Design Phase documents shall be provided within 14 calendar days after <br />receipt of Preliminary Design Phase comments from the Owner. Within 7 days of <br />receipt, Owner shall submit to Engineer any comments and, subject to the provisions of <br />Paragraph 6.01.G, instructions for revisions. <br />f. Revise the plans and bidding documents in accordance with comments and instructions <br />from the Owner, as appropriate, and submit one 1 final copy of the bidding documents, <br />a revised opinion of probable Construction Cost, and any other deliverables to Owner <br />within 7 calendar days after receipt of Owner's comments and instructions. Additionally <br />the following information shall be provided in Adobe Acrobat® .pdf format (latest <br />version at the time of completion of the plans) on CD-ROM. <br />2. Engineer's services under the Final Design Phase will be considered complete on the date <br />when the submittals required by Paragraph A1.05.A.6 have been delivered to Owner. <br />3. In the event that the Work designed or specified by Engineer is to be performed or furnished <br />under more than one prime contract, or if Engineer's services are to be separately sequenced <br />with the work of one or more prime Contractors (such as in the case of fast -tracking), Owner <br />and Engineer shall, prior to commencement of the Final Design Phase, develop a schedule <br />for performance of Engineer's services during the Final Design, Bidding or Negotiating, <br />Construction, and Past -Construction Phases in order to sequence and coordinate properly <br />such services as are applicable to the work under such separate prime contracts. This <br />schedule is to be prepared and included in or become an amendment to Exhibit A whether or <br />not the work under such contracts is to proceed concurrently. <br />4. The number of prime contracts for Work designed or specified by Engineer upon which the <br />Engineer's compensation has been established under this Agreement is one (1). If more <br />prime contracts are awarded, Engineer shall be entitled to an equitable increase in its <br />compensation under this Agreement. <br />C. Phase 2 <br />Page 3 <br />(Exhibit K— Amendment to Owner -Engineer Agreement) -- Attachment 1) <br />EJCDC E-500 Agreement BeWeen Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />