Laserfiche WebLink
DIVISION DI <br />Item <br />No. <br />Description <br />I <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />306 <br />SY <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />306 <br />SY <br />3 <br />CONCRETE CURB, REMOVE <br />859 <br />LF <br />4 <br />CONCRETE CURB, MODIFIED <br />859 <br />LF <br />5 <br />CONCRETE APPROACH, REMOVE <br />99 <br />SY <br />6 <br />PCCP FOR APPROACHES, 64N <br />89 <br />SY <br />7 <br />TOPSOIL AND SEEDING <br />312 <br />SY <br />a s'c/(,> <br />11 <br />TREE, REMOVE, 30 IN <br />2 <br />EA <br />r <br />Woo <br />12 <br />TREE, REMOVE, 48 IN <br />2 <br />EA <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, <br />2-IN TO 2.5 IN <br />4 <br />EA <br />'2ev <br />15 <br />CURB RAMP, REMOVE <br />19 <br />SY <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />5 <br />Sy <br />0, <br />f 5 <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />12 <br />SY <br />9 ep <br />A <br />rinTINIT61111 "10 <br />21OA;L- <br />DIVISION D1 ;� Z TOTAL' / " <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price, <br />Total Amount <br />I <br />CONCRETE SIDEWALK, REMOVE <br />225 <br />SY <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />225 <br />SY <br />3 <br />CONCRETE CURB, REMOVE <br />305 <br />LF <br />4 <br />CONCRETE CURB, MODIFIED <br />305 <br />LF <br />0? <br />5 <br />CONCRETE APPROACH, REMOVE <br />80 <br />sy <br />e5W: <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />80 <br />SY <br />,X9 <br />7 <br />TOPSOIL AND SEEDING <br />219 <br />SY <br />pen <br />dt <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />r i <br />2-OCk) <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, <br />1 <br />EA <br />2-IN TO 2.6 IN <br />DIVISION D2 TOTAL;f oe- <br />Bidder (Firm): <br />Version 10117/2017 Contractor's Bid for Pubfic Works - 9 <br />ADDENDUM #1 <br />