My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2018 Curb and Sidewalk Construction Proj No 118-007 - Premium Concrete Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - 2018 Curb and Sidewalk Construction Proj No 118-007 - Premium Concrete Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 2:08:50 PM
Creation date
6/27/2018 8:29:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/26/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7eAT1Pr*1'kT ": <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE S,IDEWALK, REMOVE <br />63 <br />SY <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />63 <br />Sy <br />3 <br />CONCRETE CURB, REMOVE <br />175 <br />LF <br />315 Ao <br />4 <br />CONCRETE CURB, MODIFIED <br />175 <br />LF <br />r <br />/0 "P5- <br />5 <br />1 CONCRETE APPROACH, REMOVE <br />49 <br />SY <br />6 <br />PCCP FOR APPROACHES, 6-IN <br />49: <br />SY <br />7 <br />TOPSOIL AND SEEDING <br />100 <br />SY <br />L2 <br />12 <br />TREE, REMOVE, 48 IN <br />1 <br />EA <br />2c;Co,� <br />;Z eiM-> <br />14 <br />PLANT, DECIDUOUIS TREE, SINGLE <br />STEM, 2-IN TO 2.5 IN <br />1 <br />EA <br />0, t,-e, 425! <br />DIVISION 131 TOTAL # 311� ri66r'�' <br />DIVISION 132 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />191 <br />SY <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />191 <br />SY <br />3 <br />CONCRETE CURB, REMOVE <br />146 <br />LF <br />2 212 <br />4 <br />CONCRETE CURB, MODIFIED <br />146 <br />LF? <br />7 <br />TOPSOIL AND SEEDING <br />139 <br />SY <br />DIVISION 132 TOTALY <br />FIRT51prer, I R <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />607 <br />Sy <br />---- L2 OC"'5", <br />/o <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />607 <br />SY <br />wk <br />j,� 7 6, <br />3 <br />CONCRETE CURB, REMOVE <br />38 <br />LF <br />4 <br />CONCRETE CURB, MODIFIED <br />38, <br />LF <br />V . ............ <br />7 <br />TOPSOIL AND SEEDING <br />11 <br />sy <br />I qC), ��%E <br />o <br />9 <br />TREE, REMOVE, 10 IN <br />1 <br />EA <br />"7, -e, <br />2 �Le) <br />10 <br />TREE, REMOVE, 18 IIN <br />5 <br />EA <br />11 <br />TREE, REMOVE, 30 IN <br />5 <br />EA <br />MA5 <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-1 N TO, 2.5 IN <br />11 <br />EA <br />Z 700 <br />15 <br />CURB RAMP, REMOVE <br />37 <br />SY <br />fit;eo <br />16 <br />ONE-WAY PERPENDICULAR CURB <br />RAMP <br />5 <br />Sy <br />70 � ° <br />j 35t? <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />291 <br />SY <br />2125-1 <br />DIVISION C TOTAL <br />Bidder (Firm): <br />Version 10/17/2017 Contractor's Bid for Public Works - 8 <br />AD D E14 N1 Di U M # I <br />
The URL can be used to link to this page
Your browser does not support the video tag.