Laserfiche WebLink
Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />233 <br />SY <br />722 <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />233 <br />Sy <br />3 <br />CONCRETE CURB, REMOVE <br />243 <br />LF <br />4 <br />CONCRETE CURB, MODIFIED <br />115 <br />LF <br />7 <br />TOPSOIL AND SEEDING <br />170 <br />SY <br />L 7260 S? a-� <br />11 <br />TREE, REMOVE, 30 IN <br />1 <br />EA <br />e1v <br />2,000 <br />12 <br />TREE, REMOVE, 48 IN <br />1 <br />EA <br />13 <br />STUMP, REMOVE <br />1 <br />EA <br />52"� <br />37CY,> <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />STEM, 2-IN TO 2.5 IN <br />2 <br />EA <br />2 0 <br />CONCRETE CURB, TYPE A <br />128 <br />DIVISION E TOTAL# 5'5- 1,29 <br />i <br />1 -0 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />I <br />CONCRETE SIDEWALK, REMOVE <br />273 <br />Sy <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />273 <br />SY <br />11 <br />TREE, REMOVE, 30 IN <br />5 <br />EA <br />'e,,,�, ('5 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE <br />EA <br />5-�X> <br />STEM, 2-IN TO 2.5 IN <br />5 <br />15 <br />CURB RAMP, REMOVE <br />22 <br />SY <br />&0 <br />2 ?61 <br />18 <br />PAIRED PERPENDICULAR CURB RAMP <br />22 _ <br />Sy <br />,220 <br />(/6110 <br />DIVISION F TOTAL f <br />1 01 kyj 61 Is] = <br />Item <br />No. <br />Description <br />I <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />60 <br />SY <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />280 <br />SY <br />7 <br />TOPSOIL AND SEEDING <br />350 <br />SY <br />16 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />5 <br />s,y <br />10 <br />21 <br />CLEARING AND GRUBBING <br />60,00 <br />SF <br />02 �eO <br />r,-5�e <br />4>,n <br />22 <br />EXCAVATION, COMMON <br />40 <br />CY <br />6,X1 <br />I 11Won <br />23 <br />COMPACTED AGGREGATE, No. 53 <br />36 <br />TON <br />1;?C> <br />24 <br />25 <br />BACKFILL <br />TEMPORARY EROSION CONTROL <br />20 <br />1 <br />CY <br />LS <br />f. <br />0 <br />2 oer ,> <br />CAO CV <br />DIVISION G1 TOTAL <br />Bidder (Firm): <br />Version 10/17/2017 Contractor's Bid for Public Works - 10 <br />A1D1)P4DJM 91 <br />