Laserfiche WebLink
Network -Wide <br />• NSI will conduct an Installation Review meeting and verify the Project Plan including network design, equipment delivery, <br />installation times, and testing procedures. <br />Switching <br />• NSI will assemble the new equipment including installation of rackmount hardware, modules, and power supplies and install <br />the devices in the existing equipment racks. <br />• NSI will configure the new switches according to the agreed upon design and cutover from the existing equipment. The new <br />equipment will take over handling production traffic. <br />Wireless <br />• NSI will install and document the location of each access point by room number, name, and AP MAC address. (3rd Party <br />Contractor) <br />• CoSB will provide lift access if required for high AP cabling or Installation (if applicable) <br />• NSI will configure hostnames for each AP based upon their location. <br />• NSI will reconfigure the switching infrastructure with new VLANs for new wireless SSIDs (up to 4) on the switching <br />infrastructure. Further configuration of switches is outside the scope of this project unless explicitly specified in other sections <br />of this scope of work. <br />• CoSB will provide ©HCP services for any new networks that are created. <br />Testing Responsibilities: <br />Network -Wide <br />• NSI and CoSB will test access to the critical services identified in the testing plan. <br />Switching <br />NSI will verify proper operation of the installed equipment as identified in the testing plan. At the completion of testing all <br />devices should be capable of passing traffic through their uplink port, being remotely managed, and have had a backup copy of <br />their configuration taken. <br />Wireless <br />• NSI will verify proper operation of the installed equipment as identified in the testing plan. <br />• NSI will adjust wireless signal settings to best provide coverage and service to wireless users. Access points may need to be <br />relocated to achieve optimal coverage. NSI will determine if a change order is required for additional services associated with <br />relocation of access points. <br />Training & Support Responsibilities: <br />Network -Wide <br />• No training is included as part of this proposal <br />Final Deliverables <br />Following the completion of this project, NSI and CoSB will review the work completed. As part of this review NSI will provide the <br />following: <br />Network -Wide <br />NSI will provide documentation of the testing results including identified critical services, initial testing result, any required <br />corrective actions, and final testing results (where necessary). <br />NSI will provide documentation that identifies all products installed, their serial number, and the corresponding <br />location/building they were installed in. <br />Switching <br />• NSI will provide network design documentation On digital format) of <br />o A network drawing containing the devices installed <br />www.nsil.com WHY we do is as important as WHAT we do (574) 271-0900 <br />