My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Ironwood Dr. Pavement Rehabiliation Proj No 117-071A - Rieth Riley Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Ironwood Dr. Pavement Rehabiliation Proj No 117-071A - Rieth Riley Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:11:59 PM
Creation date
3/14/2018 9:26:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. The cost of milling, excavation and disposal of existing materials, including existing <br />composite or asphalt pavement, required for compacted aggregate or HMA <br />patching material shall be included in the cost of the HMA patching. <br />2. Replacement of pavement damaged by the Contractor's operations shall be at no <br />additional payment. <br />3. Patching and pay limits will be paid to the neat lines as shown on the plans unless <br />approved or directed by the Owner. <br />4. HMA Patching for partial depth patches shall be placed the same day as the <br />existing asphalt pavement was removed. Liquidated Damages will be assessed <br />for each day that a patch remains unpaved. <br />5. <br />6. <br />7. <br />8. <br />9. <br />XXXVII. MILLING <br />Full depth HMA Patching shall be complete by noon on Friday of the week existing <br />pavement was removed. Liquidated Damage will be assessed beginning at that <br />time. <br />Drums will be required around patching areas until the pavement is within 2 in. of <br />the surface. <br />Patching shall be performed with lifts to the existing pavement surface prior to mill <br />and resurface of adjacent pavement to establish a uniform milled surface. <br />Payment shall be made at the Unit Price as specified in the Proposal as follows: <br />HMA Patching, Type C.........................................TON <br />HMA Base used for full depth HMA Patching shall be 25 mm. <br />A. Prevailing Specifications: 2018, INDOT Standard Specifications Section 306 <br />B. Additions: <br />1. Payment shall be made at the Unit Prices as specified in the Proposal as follows: <br />Milling, Asphalt, 1.5 in .......................................... SYS <br />Milling, Transition ................................................. SYS <br />XXXVIII. HOT MIX ASPHALT <br />A. Prevailing Specifications: City of South Bend, Indiana, Department of Public Works, <br />Prevailing Specifications, Section 402. <br />B. Additions: <br />1. Original weight tickets shall be provided to the Owner for each day on which <br />asphalt is placed. The Owner reserves the right to require certified scales be used <br />for measurement. <br />2. No vehicular traffic of any kind shall be permitted on any lift until the mixture has <br />hardened sufficiently to not be unduly distorted. <br />Version 7/01/2018 SP - 19 <br />Revised February 22, 2018 (Addendum 1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.