Laserfiche WebLink
12. Concrete wastewater shall not be disposed of on the ground or allowed to leak <br />onto the ground. Otherwise, the provisions of 205-R-636, included in the Erosion <br />Control Permit, will be in effect. <br />13. Product for temporary drop inlet protection for erosion and sediment control shall <br />be FlexStorm Inlet Filter by Inlet & Pipe Protection, Inc. or approved equal. <br />14. The cost of Temporary Erosion and Sediment Control, Drop Inlet Protection shall <br />include the removal and disposal of sediment, as directed by the project <br />representative. If the FlexStorm Inlet Filter is damaged during construction of this <br />project either by normal use, remaining sediment or vandalism, it shall be <br />replaced at no cost to the City. <br />15. Payment shall be made at the Unit Prices as specified in the Proposal as follows: <br />Temporary Erosion and Sediment Control ........... LS <br />Temporary Drop Inlet Protection .......................... EACH <br />Temporary Silt Fence ........................................... LFT <br />16. The cost of erosion control items not provided separately shall be included in the <br />contract LSUM costs. <br />XXXIV. SUBGRADE TREATMENT <br />A. Prevailing Specifications: 2018 INDOT Standard Specifications Section 207. <br />B. Additions: <br />1. Payment shall be made at the Unit Prices as specified in the Proposal as follows: <br />Subgrade Treatment, Type I ................................ SYS <br />Subgrade Treatment, Type I I ............................... SYS <br />2. No. 53 Recycled Concrete may be used for subgrade treatment. <br />XXXV. SUBBASE FOR PCCP <br />A. Prevailing Specifications: 2018 INDOT Standard Specification Sections 302. <br />B. Additions: <br />1. Payment shall be made at the Unit Prices as specified in the Proposal as follows: <br />Subbase for PCCP............................................... CYS <br />XXXVI. HMA PATCHING <br />A. Prevailing Specifications: 2018 INDOT Standard Specification Sections 304 <br />B. Additions: <br />Pavement to be removed as shown on the plans shall be saw cut to neat lines at <br />removal limits for full depth prior to removal. Saw cutting for removal shall not be <br />measured for payment but shall be considered incidental to the unit cost of this <br />item. <br />Version 7/01/2018 SP - 18 <br />Revised February 22, 2018 (Addendum 1) <br />