My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Ironwood Dr. Pavement Rehabiliation Proj No 117-071A - Rieth Riley Construction Co Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Ironwood Dr. Pavement Rehabiliation Proj No 117-071A - Rieth Riley Construction Co Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:11:59 PM
Creation date
3/14/2018 9:26:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. overlay of the existing asphalt pavement south of S.R. 23 in South Bend, according <br />to the intent of the Plans and Specifications. <br />5. The Contractor shall preserve and protect all surrounding property, structures, <br />tenants, visitors and their property from damage caused by the Contractor's <br />operations. <br />XXII. MUNICIPAL OPERATIONS <br />A. Prevailing Specifications: None <br />B. Additions: <br />The Contractor shall be responsible for trash, yard waste, and recycling collection <br />within the project limits. The Contractor shall coordinate with the City of South <br />Bend Solid Waste, Waste Management, and other pickup services as requested <br />to ensure collection services are maintained. The Contractor shall be required to <br />collect bins, place them in a common point for easy access by automated truck <br />services, and redistribution after pickup as requested. <br />2. The Contractor shall be responsible for snow removal within the project limits and <br />shall coordinate with City of South Bend Public Works. The Contractor is <br />responsible for protecting his project site from excessive wear and tear during <br />snow removal. <br />XXIII. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of 46 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of <br />materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special <br />Provisions shall govern. <br />XXIV. CONSTRUCTION ENGINEERING <br />A. Prevailing Specifications: 2018, INDOT Standard Specification Sections 105.08(b), <br />105.08(c) <br />B. Additions: <br />1. The Contractor will provide all work required under this item. <br />2. The Engineer will be responsible for the horizontal and vertical control points as <br />shown on the plans. <br />Version 7/01/2018 SP - 12 <br />Revised February 22, 2018 (Addendum 1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.