My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Charles Black Center Renovation Project No. 116-073 - Gibson-Lewis LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Charles Black Center Renovation Project No. 116-073 - Gibson-Lewis LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 8:54:36 AM
Creation date
9/13/2017 2:01:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PART 2 — SPECIFICATIONS <br />2.01 Edit Spec section 042200 Unit Masonry 2.01 C. Face Brick/Block: 3. Sizes modular use field measurements of existing <br />oversize brick/block <br />2.02 Section 116500 Gymnasium and Field Play Equipment 2.4 Basketball Sack stop Winches A. Change Portable Electric <br />Operator Model 269 to 707'/4 HP electric hoist. <br />2,03 Eliminate spec section 116500 Gymnasium and Play Field equipment 2.10 Volleyball equipment section H Volleyball net <br />storage system. <br />2.04 Section 116643 2.4 Accessories/Options B I Eliminate shot clock requirement. End of period (I pair I each of main goals) <br />2 Eliminate Stat panels <br />4 Eliminate `A' "AD' and "ADL' install corner panel for CBC Logo <br />5 Eliminate full color message center. <br />2.05 REPLACE Bid proposal sheets per attached documents. <br />PART 3 — CONSTRUCTION DRAWING / DETAILS <br />3.01 SHEET A201-4 EXTERIOR ELEVATIONS: <br />Expansion joints <br />3.02 SHEET A202 EXTERIOR ELEVATIONS: <br />Expansion joints <br />PART 4 — PRODUCT APPROVALS <br />t. Daktronics is approved as equal for Nevco for Gym score boards. <br />2. Performance Sports Systems is approved as substitution for Porter Gymnasium equipment <br />Addendum #1 <br />Mecltanical, Electrical, Plumbing <br />August 17, 2017 <br />SPECIFICATIONS <br />SECTION 2201 t0 <br />Paragraph 2.I.B: <br />Add "Storm" to the paragraph heading. <br />SECTION 220500: HEATING AND AIR CONDITIONING: <br />Paragraph 2.2: PACKAGE HVAC UNIT (GYMNASIUM 5A AND 513): Add the following Paragraph U: <br />U. Include start-up and commissioning through manufacturer's representative. Provide copy of final reports. <br />Manufacturer's representative shall include at least two additional site visits during warranty period (in <br />addition to start-up and any required warranty work) to provide additional Owner Training and any control <br />adjustments requested by the Owner, Engineer or installing contractor. <br />Charles Black Center Addendum #1 <br />Aug. 17, 2017 Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.