Laserfiche WebLink
DRAWINGS <br />SHEET M20I <br />1. Add the following coordination note: "If Alternate #6 (Concession Room) is accepted terminate and cap hot <br />water return, tepid water return, hot water supply and tepid water supply piping within Mechanical - 013 for <br />future use. Stub in West 3" sanitary piping into Concession - 126 and cap for future use." <br />2. Add the following coordination note: "If Alternate #7 (Hike Shop) is accepted terminate and cap cold water <br />supply and hot water supply piping within Women locker - 108 for use. Stub in West 3" sanitary piping and cap <br />for future use. Delete DSS-1A and associated piping in its entirety." <br />3. Add the following coordination note: "If Alternate #6 is accepted and Alternate ##7 is NOT accepted provide <br />Grease Interceptor GI-1, clean out and associated waste and vent piping as shown, extend feed 3" sanitary <br />piping into Concession -126 and cap for future use. <br />4. Add the following coordination note: "If Alternate #6 in NOT accepted and Alternate #7 is accepted provide all <br />Grease Interceptor GI-1 waste and vent piping within Bike Shop. Provide 2" waste piping stub for future tub <br />sink." <br />SHEET M203 <br />1. Enlarged Concession Plumbing Plan: See sheet M201 note #1 above. <br />2. Enlarged Concession Plumbing Plan: See sheet M201 note #2 above. <br />3. Enlarged Concession Plumbing Plan: See sheet M201 note #4 above. <br />SHEET M301 <br />Add the following coordination note: "if Alternate #7 (Bike Shop) is accepted delete DSS-1A, DSS-1B and all <br />associated piping in its entirety." <br />SHEET M501 AND M502: <br />1. Delete any references to "by CAS" and supplied by "distributor". The Contractor is responsible for the <br />distribution of all work. Mechanical Trade shall coordinate responsibilities for supplying and installing <br />equipment as required, including providing and installing the Kitchen Hood, Hood Exhaust System, Rated Grease <br />Duct System, Make-up Air System and Hood Fire System. The "basis of design" is Captive -Aire, however, other <br />fully integrated systems meeting specifications can be submitted for approval during bidding. Systems provided <br />as various components that are not the responsibility of a single hood system supplier are not acceptable. <br />SHEET E 101 <br />5. Add the following to Electrical Demolition Note #9. "If Alternate #9 is accepted, existing Gymnasium lighting <br />shall be turned over to Owner after removal." <br />SHEET E201 <br />Charles Black Center Addendum #1 <br />Aug. 17, 2017 Page 3 <br />