Prepared by: Jones Petrie Rafinski <br />ADDENDUM NO. 1 <br />To the Contract Document and Project Specifications for the <br />CHARLES BLACI{ CENTER <br />SOUTH BEND INDIANA <br />PROJECT NO.2015-0200 <br />SOUTH BEND PARKS <br />Date: Aug 17, 2017 <br />To: All holders of the contract documents for the above project. <br />The items in this addendum are to become a part of the original documents as if included therein, Only the noted items are affected <br />and the remainder of the original contract document is to remain in its entirety. <br />This Addendum modifies the Contract Documents as follows: <br />Part I — General Clarifications <br />Part 2 — Specifications <br />Part 3 — Construction Drawings/Details <br />Pala 4 — Product Approvals <br />PART 1— GENERAL CLARIFICATIONS <br />1. REVISE Bid Due date to Sept 12, 2017 at 9:30 AM <br />2. Nan -Mandatory site visit dates are Tuesday August 241' at 10:30 AM and Wednesday Aug 25, at 10:00 AM. <br />3. Contractors are required to bid all Alternates <br />4. Alternate #1. Deduct Flex Space. Does this mean to keep the existing walls? No addition but it will get a new roof'? Do the <br />exterior elevations stay the same? Yes, keep existing walls, no addition, yes new roof, yes existing exterior elevations stay <br />the same. <br />5. Alternate #3. Gym Room 102. Does this mean to not build the footings, walls and roof? If deduct this then the Maintenance <br />Storage room 103 will remain and have a 4" exterior wall on the west. Also, would door 102 be eliminated? Yes, no <br />footings, walls or roof, 4" wall at maintenance would change to 8" exterior wall, yes door 102 would be eliminated. <br />6. Alternate #4. Storage Room 103. Same problem what about the east wail? Do we eliminate doors 103A and 103b? Exterior <br />wall would change to 8", yes eliminate 103A and 103B. <br />7. Alternate #7. Bike Shop. Are we to delete the exterior wall, roof and doors? Or just not do any work inside the room? Yes, <br />delete exterior walls, footings, roof and doors. <br />8. Vestibule 120. What size of floor mat is required? 5'-0" x 8%0" (Include allowance of $500 for Charles Black Logo in floor <br />mat. (Logo provided by owner at later date) <br />9. Are there any fire extinguishers or cabinets for them? Fire extinguishers are shown on Life Safety Sheet A041. <br />10. What are the locations of any expansion joints? Will be issued on updated elevation sheet in Addendum L Use Fiber cement <br />panel manufacturer guidelines for expansion joint detail. <br />11. Room finish schedule A601. Weight room has Rub/Matt. What material is required for this? American Floor mats `fit lock' <br />rubber tiles 3/8" thick 2' x 2' rubber interlocking 10 % blue. {Include allowance of $1,000 for Charles Black Logo in floor <br />mats. (Logo provided by owner at later date) <br />12. Is water repellant required integral in the block as well as applied after? No integral water repellant is sufficient. <br />13. The Charles Black Center will be closed to public and unoccupied during construction. <br />14. Alternate #6 Concession Room and Equipment. Rough in for plumbing and electric shall be part of base bid. <br />15. Alternate #5 New HVAC Unit curb and flashing and electrical supply shall be part of base bid. The RTU and duct work shall <br />be alternate. <br />Charles Black Center Addendum #I <br />Aug. 17, 2017 Page 1 <br />