My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Industrial Discharge Permit - St. Joseph Energy Center
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Licenses and Permits
>
Industrial Discharge Permit - St. Joseph Energy Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 3:18:24 PM
Creation date
5/24/2017 1:44:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Permit Applications
Document Date
5/23/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f. The permittee shall control production of all discharges to the extent necessary to maintain <br />compliance with categorical Pretreatment Standards upon reduction, loss, or failure of its <br />treatment facility until the facility is restored or an alternative method of treatment is provided. <br />This requirement applies in the situation where, among other things, the primary source of power <br />of the treatment facility is reduced, lost, or fails. <br />6. Administrative En orcement <br />a. Any permittee found in violation of any applicable local, state, federal law, City of South Bend <br />Municipal Code Chapter 17, or any conditions within this permit will be subject to Administrative <br />Enforcement Action in accordance with the Enforcement Response PIan (ERP) provided in <br />Attachment 2 to this permit. <br />7. Penalties for False Reporting <br />a. Any person who knowingly makes any false statement, representation or certification in any <br />application, record, report, plan or other document filed or required to be maintained pursuant to <br />this permit, or who falsifies, tampers with, or knowingly renders inaccurate any monitoring device <br />or method required under this permit, shall be subject to administrative fines of not more than <br />$2500 per day per violation and/or civil litigation and/or fines and imprisonment upon criminal <br />conviction. <br />8. Penalties for Violation of Pretreatment Standards <br />a. Any permittee found in violation of Pretreatment Standards and Requirements (40 CFR 403), the <br />City of South Bend Municipal Code, or this industrial wastewater discharge permit issued by the <br />City of South Bend and any applicable compliance schedules, shall be subject to administrative <br />fines of not more than $2500 per day per violation and/or civil litigation and/or fines and <br />imprisonment upon criminal conviction. <br />9. Revocation of Permit <br />a. The Director may revoke an individual wastewater discharge permit for good cause, which shall <br />be subject to appeal under Article 2, Chapter 17, Subsection 17-1 I(c) of the South Bend <br />Municipal Code, but the effectiveness of revocation shall not be stayed pending administrative <br />appeal. Reasons for permit revocation by the Director include, but are not limited to the <br />following: <br />i. Failure to notify the Director of significant changes to the wastewater prior to the changed <br />discharge; <br />ii. Failure to provide prior notification to the Director of changed conditions pursuant to Article <br />2, Chapter 17, Subsection 17-10(o)(5); <br />iii. Misrepresentation or failure to fully disclose all relevant facts in the wastewater discharge <br />permit application; <br />iv. Falsifying periodic compliance reports and certification statements; <br />v. Tampering with monitoring equipment; <br />vi. Refusing to allow the Director timely access to the facility premises and records; <br />vii. Failure to meet effluent limitations; <br />viii. Failure to pay fines; <br />ix. Failure to pay sewer charges; <br />
The URL can be used to link to this page
Your browser does not support the video tag.