291, <br />REGULAR MEETING JULY 11, 1983 <br />APPROVE CONSTRUCTION CONTRACT - CASTEEL CONSTRUCTION <br />CORPORATION - RECONSTRUCTION OF.RADIO ROOM (OLD CITY <br />JAIL) IN THE MSF BUILDING, AT 701 WEST SAMPLE STREET <br />Mr. Leszczynski advised that in accordance with the bid <br />awarded on March 14, 1983, to Ca.steel Construction Corpora- <br />tion, 23086 West Ireland Road, P.O. Box 628, South Bend, <br />Indiana, in the amount of. 114,000,00 for the above referred <br />to project, a contract in said amount was being submitted <br />for Board approval. Upon a motion made by Mr. Leszczynski, <br />seconded by Mr. Hill and carried, the above contract was <br />approved subject to the filing of the required insurance, <br />Performance Bond and Labor and Materials Payment Bond. <br />APPROVE CHANGE ORDERS # 7 .8 & 9 BATES AND ROGERS <br />CONSTRUCTION (COLFAX AVENUE BRIDGE`PROJECT) <br />Mr. Leszczynski advised that Bates & Rogers Construction <br />Company has submitted Change Orders #7, 8 & 9 indicating <br />the following <br />Change Order #7: <br />In the amount'of $800.00 for one (1) 3'x3'x7' signal <br />pole foundation and one (1) 2" L.B. This additional <br />work is per the request of the LaPorte. District <br />Traffic Department and C.O. Bridge Design is needed <br />to sufficiently handle a longer mast arm and <br />different signal pole.. .The existing foundation <br />was found insufficient for this change. <br />Change Order #8: <br />This change or er indicates an increased estimate <br />cost of $175.00 for a two inch steel pipe conduit. <br />This additional conduit is required to connect <br />the existing foundation to the proposed one. <br />Change Order #9: <br />In the amount of $821.56 for one (1) layout, <br />redrilling and placement of inserts in concrete <br />I Beams (Span B). This additional work was <br />required due to an error in the contract drawings. <br />The spacing for the inserts in Span B were incorrect, <br />thus, the change. <br />Upon a motion made by Mr. Leszczynski, seconded by Mr. Hill <br />and carried, the above Change Orders were approved. <br />APPROVE TITLE SHEET - CUSHING STREET IMPROVEMENTS (NHS) PROJECT <br />Mr. Leszczynski stated that the Title Sheet for the Cushing <br />Street Improvements (NHS) Project was being presented at <br />this time for execution. Upon a motion made by Mr. Leszczynski, <br />seconded by Mr. Hill and carried, the above Title Sheet was <br />approved and signed. <br />APPROVE LICENSE APPLICATION SECONDHAND DEALER <br />Mr. Leszczynski advised that a license application was received <br />from Ms. Janet.S. Snyder, 814 Allen Street, South Bend, -to <br />operate Jan's Book Mark at 510 L.W.W., South Bend, Indiana.. <br />He further advised that favorable.reports have been received <br />from the.Police Department, Fire Department, Bureau of Traffic <br />and Lighting and the Department of Code Enforcement. Upon a <br />motion made by Mr. Leszczynski, seconded by Mr. Kernan and <br />carried, the above license application was approved and <br />referred to the Deputy Controller's Office for issuance. <br />