Laserfiche WebLink
writing to these project documents within S business days, the Client agrees that the project documents <br />provided by ENS are considered approved and accepted by the Client. <br />OUT OF SCOPE ISSUES <br />During the design phase of this project, ENS and City of South Bend have mutually determined that certain items are not <br />included, and should therefore be considered out -of -scope for this particular fixed -fee project. If the client seeks to <br />pursue these options, ENS may certainly be used to do so. However, the fixed project fee for this engagement does not <br />include the options/issues listed below: <br />Out of Scone for Cisco Infrastructure <br />ENS Group has identified that certain items are not included, and should therefore be considered out -of -scope for this <br />particular fixed -fee project. If the client seeks to pursue these options, ENS may certainly be used to do so. However, <br />the fixed project fee for this engagement does not include the options/issues listed below: <br />1. Networking on Equipment other than the Equipment Purchased through ENS for this project. This <br />project includes the installation and updates to anew and an existing networking infrastructure. No VLAN, <br />VPN, Routing, DMZ creation or changes are included other than those specified in the Installation section above. <br />2. Racks, KVM, Ventilation, and Power. Equipment Racks (Telco and/or Server), KVM Switches, Air <br />Conditioning, UPS devices, PDUs, associated cables/cords, or electrical hard wiring is not included as part of <br />this project. This includes but is not limited to HVAC, duct work, circuit breakers, breaker panels, conduit, <br />wiring for power, outlets, backup power generators, etc. <br />3. Tech Support. Any and all end -user technical support is not included as part of this project. <br />4. Training. Limited training and knowledge transfer may be provided as part of this project as defined <br />specifically in the Project Scope section of this agreement. However, in-depth training related to vendor <br />specific items is considered out of scope. <br />S. Bandwidth, Circuits, and Troubleshooting related to Internet and/or WAN connectivity. No bandwidth, <br />WAN circuits, or Telco lines are included in the project, nor are any ISP, telecommunication, and/or broadband <br />vendor specific issues and troubleshooting for any data, PRI trunks, and/or phone services included in this <br />project. <br />6. Troubleshooting related to Internet connectivity. Any ISP specific issues or troubleshooting are not <br />included within the scope of this project. <br />7. Troubleshooting related to LAN connectivity. Any LAN network specific issues or troubleshooting are not <br />included within the scope of this project. <br />B. Cabling. Structured Cabling, Patch Panels, and/or Ethernet Cables (copper or fiber) are not included as part of <br />this project. ENS will provide the specifications for the cabling required as needed; however, the cabling and <br />cables (structured or patch) themselves are not included within the scope of this project. The cables (to ENS <br />and vendor specifications) may be purchased by City of South Bend, either from ENS or another vendor. ENS <br />will arrange for a preferred cabling vendor to provide a quote to meet our cabling recommendations if <br />requested. Any work for tracing, toning or the labeling of cables, other than those specifically called out in the <br />Installation and Configuration section, will be outside of the scope of this project and will require a change <br />request. <br />9. ALL OTHER. Unless specifically stated or documented, no other services are included in this fixed -fee project. <br />Statement of Work for City of South Bend 7 <br />