My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/28/99 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1999
>
09/28/99 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:15:48 PM
Creation date
8/31/2016 12:32:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/28/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR 1VIEETING SEPTEMBER 28, 1999 <br />APPROVAL OF RECOMMENDATION - BOY SCOUTS OF AMERICA - ALL NIGHTER <br />Mr. Caldwell stated that favorable recommendations have been received by the Division of <br />Engineering and the City Attorney's office, however Capt. Larry Blume, South Bend Police <br />Department, denied the request due to manpower restraints, in reference to a request as submitted <br />by Mr. Andrew Dickey, Boy Scouts of America, 1433 Northside Blvd., South Bend, Indiana to <br />conduct the above referred to event, on October 22, 1999, on the designated route as submitted. <br />Therefore, Ms. Roemer made a motion that the request be tabled for further information. Mr. Powell <br />seconded the motion which carried. <br />REQUEST FOR. A PERMIT ALLOWING TEMPORARY OCCUPANCY OF PUBLIC <br />PROPERTY - REINKE CONSTRUCTION <br />Mr. Caldwell stated that to board is in receipt of an application for a permit allowing temporary <br />occupancy of public property for longer than thirty (30) days. The duration of occupancy is from <br />September 28, 1999 to December 28, 4999. Therefore, Mr. Caldwell made a motion that the request <br />be tabled. Mr. Powell seconded the motion which carried. <br />RELEASE CONTRACTOR BOND <br />Mr. Larry D. Spradlin, Sr., Engineer, Division of Engineering, recommended that the following <br />Contractors Bond be released effective April 20, 2000 as follows: <br />BOND OF CONTRACTOR <br />The Robert Henry Corporation <br />Post Office Box 1407 <br />South Bend, Indiana 46624 <br />Mr. Caldwell made a. motion that the recommendation be accepted and that the Bonds be released <br />as outlined above. Ms. Roemer seconded the motion which carried. <br />CONTRACTOR BOND <br />Mr. Larry D. Spradlin, Sr., Engineer, Division of Engineering, recommended that the following <br />Contractors Bonds be approved as follows: <br />BOND OF CONTRACTOR <br />B & B Equipment, Inc. <br />5750 West Brick Road <br />South Bend, Indiana 46624 <br />BOND OF CONTRACTOR <br />Mr. Kenneth Washington <br />24800 Fillmore Road <br />South Bend, Indiana 46619 <br />BOND OF CONTRACTOR <br />Mr. Bruce Shoup <br />927 Clover Street <br />South Bend, Indiana 46615 <br />Mr. Caldwell made a motion that the recommendation be accepted and that the Bonds be approved <br />as outlined above. Ms. Roemer seconded the motion which carried. <br />REQUEST FOR A PERMIT ALLOWING TEMPORARY OCCUPANCY OF PUBLIC <br />PROPERTY - VERKLER INC <br />Mr. Caldwell stated that to board is in receipt of an application for a permit allowing temporary <br />occupancy of public property for longer than thirty (30) days. The duration of occupancy is from <br />September 28, 1999 to February 15, 2000. Therefore, Ms. Roemer made a motion that the request <br />be approved. Mr. Powell seconded the motion which carried. <br />1 <br />I.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.