Laserfiche WebLink
Change Order No. 07 <br />One- Way to Two -Way Street Conversion <br />Division B <br />The following sections of the Contract �dcumeonts a e revised as a result of the above changes: <br />BIDDING AND CONTRACT REQUIREMENTS- <br />1. Bid/Proposal Form: <br />Division B: <br />Subtract 2 CYS from Line Item 37: STRUCTURAL BACKFILL, TYPE 1, -2 CYS @ <br />$21.60/CYS for a total deduction of ($43.20) <br />Subtract 1 TON from Line Item 43: WIDENING WITH HMA, TYPE D, -1 TON @ <br />$110.00/TON for a total deduction of ($-110.00) <br />Add 2 SYS to Line Item 44: MILLING, ASPHALT, 1 % IN, 2 SYS @ $1.75/SYS for a <br />total addition of $3,50 <br />Subtract 4 SYS from Line Item 87: CURB RAMP, CONCRETE, A, -4 SYS @ <br />$140.00/SYS for a total deduction of ($-560.00) <br />Add 5 LFT to Line Item 100: CURB, CONCRETE, 5 LFT @ $19.00/LFT for a total <br />addition of $95.00 <br />Add 4 SYS to Line Item 114: SODDING, BURSERY AND TOPSOIL, 4 SYS @ <br />$4.30/SYS for a total addition of $17.20 <br />Subtract 6 LFT from Line Item 160: PIPE, TYPE 2 CIRCULAR 12 IN, -6 LFT @ <br />$24.00/LFT for a total deduction of ($-144.00) <br />Subtract 2 EA from Line Item 187: MANHOLE, C4, -2 EA @ $1,985.00/EA for a total <br />deduction of ($-3,970.00) <br />Add 1 EA to Line Item 191: MANHOLE, H4, 1 EA @ $3,375.00/EA for a total addition <br />of $3,375.00 <br />SPECIFICATIONS: <br />NO CHANGE REQUIRED <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change <br />Order: <br />Sheet 2 —Revision Note No. 10 Added <br />Sheets 68 — Revised Curb Ramp and Structure locations and callouts <br />Sheets 68 — Revised Curb Ramp elevation details <br />Sheet 231 — Revised Structure Data Notes <br />END OF CHANGE ORDER NO. 7 <br />Sheet 2 of 3 <br />