Laserfiche WebLink
Project No. 116-001 <br />Change Order No. 07 - <br />06/10/16 <br />CITY OF SOUTH <br />BEND <br />PROJECT NAME: One -Way to Two -Way Street Conversion — Division B <br />PROJECT NUMBER: 116-001 <br />Division B: <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />37 <br />STRUCTURAL BACKFILL, TYPE 1 <br />-2 <br />CYS <br />$21.60 <br />($43.20) <br />43 <br />WIDENING WITH HMA, TYPE D <br />-1 <br />TON <br />$110.00 <br />($ 220.00) <br />44 <br />MILLING, ASPHALT, 1 Y IN <br />2 <br />SYS <br />$1.75 <br />$3.50 <br />87 <br />CURB RAMP, CONCRETE, A <br />-4 <br />SYS <br />$140.00 <br />($-560.00) <br />100 <br />CURB, CONCRETE <br />5 <br />LFT <br />$19.00 <br />$95.00 <br />114 <br />SODDING, NURSERY AND TOPSOIL <br />4 <br />SYS <br />$4.30 <br />$17.20 <br />160 <br />PIPE, TYPE 2 CIRCULAR 121N <br />-6 <br />LFT <br />$24.00 <br />(-$144.00) <br />187 <br />MANHOLE, C4 <br />-2 <br />EA <br />$1,985.00 <br />(-$3,970.00) <br />191 <br />MANHOLE, H4 <br />1 <br />EA <br />$3,375.00 <br />$3,375.-- <br />OWNER: City of South Bend <br />Signature <br />CONTRACTOR: Rieth-Riley Construction <br />Signature <br />9-/5- /e <br />Date <br />