My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:53:23 PM
Creation date
8/30/2016 1:50:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 07 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. <br />10504741 CONTRACTOR: Rieth-Riley Construction <br />PROJECT: One -Way to Two -Way Street Conversion <br />Project No. 116-001 <br />SUBJECT: Revised Southeast quadrant of Main and Monroe <br />ISSUE DATE: June 10, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Structure and curb ramp revision in the southeast quadrant of the intersection of <br />Main and Monroe based on changed field information. <br />Sheet 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.