Laserfiche WebLink
Change Order No. 07 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. <br />10504741 CONTRACTOR: Rieth-Riley Construction <br />PROJECT: One -Way to Two -Way Street Conversion <br />Project No. 116-001 <br />SUBJECT: Revised Southeast quadrant of Main and Monroe <br />ISSUE DATE: June 10, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Structure and curb ramp revision in the southeast quadrant of the intersection of <br />Main and Monroe based on changed field information. <br />Sheet 1 of 3 <br />