My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:53:23 PM
Creation date
8/30/2016 1:50:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 09 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />DRAWINGS: <br />The following sheets have been revised or issued as new sheets. <br />Revision 9 <br />Sheet 2 — Revision Note No 9 Added <br />Sheet 169-A Replaced Sheet, Replaced Mast Arms with Strain Poles <br />Sheet 170-A Replaced Sheet, Replaced Mast Arms with Strain Poles <br />Sheet 177-1-A Replaced Sheet, Replaced Mast Arms with Strain Poles <br />Revision 10 <br />Sheet 2 —Revision Note No 10 Added <br />Sheet 154 Revised Mast Arm Callout <br />Sheet 163-A Replaced Sheet, Traffic Signal to Remain & Utilize Mast Arms <br />Sheet 165 Revised Mast Arm Callout <br />Sheet 166 Revised Mast Arm Callout <br />Sheet 167-A Replaced Sheet, Replaced Mast Arms with Strain Poles <br />Sheet 168-A Replaced Sheet, Replaced Mast Arms with Strain Poles <br />Sheet 175-A Added NBLT & SBLT 5-Section Heads and Phasing <br />Sheet 201 Removed Stop Signs and Added Stop Bars <br />Sheet 208 Removed Stop Signs and Added Stop Bars <br />Sheet 223 Revised Sign and Totals <br />The following INDOT Standard Drawings are applicable to strain poles and are attached to this <br />change order. <br />E 805-SGSC01 Guy Alignment and Anchor Bolt Orientation (rev. 09/03/13, editorial only) <br />E 805-SGSCO2 Signal Strain Pole, Steel, Foundation Details (rev. 09/03/13) <br />E 805-SGSC03 Span and Catenary Attachment (rev. 09/03/13) <br />E 805-SGSC04 Span, Catenary & Tether Detail (rev. 09/01/15) <br />E 805-SGSP-01 30 ft & 36 ft Signal Steel Strain Poles (eff. 09/01/05) <br />E 805-SGSP-02 Top Cover & Metal Skirt of Signal Steel Strain Pole (rev. 11/15199) <br />E 805-SGSP-03 Pole Band for Signal Steel Strain Pole (rev. 11/15/99) <br />E 805-SGSP-04 Base Plate for Signal Steel Strain Pole (rev. 09/03/13) <br />E 805-SGSP-05 Anchor Bolt Detail Signal Steel Strain Poles (eff. 03/01/04) <br />END OF CHANGE ORDER NO. 9 <br />OWNER: City of South Bend <br />Signature <br />Date <br />CONTRACTOR: Rieth-Riley Construction <br />/_4WA - <br />Signature <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.