My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:53:23 PM
Creation date
8/30/2016 1:50:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 09 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />d. The Contractor shall use a wire brush or other approved equipment to remove any rust <br />or loose coatings prior to painting. <br />2. Painting shall be performed on the above mentioned traffic signal equipment at the <br />following signalized intersections: <br />a. Division A <br />(i) Main Street & Chippewa Avenue <br />(ii) Main Street & Ewing Avenue <br />(iii) Michigan Street & Donmoyer Avenue <br />(iv) Michigan Street & Ewing Avenue <br />Division B <br />(i) Main Street & Indiana Avenue <br />(ii) Main Street & Bronson Street <br />(iii) Main Street & South Street <br />(iv) Main Street & Monroe Street <br />(v) Main Street & Western Avenue <br />(vi) Main Street & Wayne Street <br />(vii) Main Street & Jefferson Boulevard <br />(viii) Main Street & Washington Street <br />(ix) Main Street & Colfax Avenue <br />(x) Michigan Street & Indiana Avenue <br />(xi) Michigan Street & Bronson Street <br />(xii) Michigan Street & Monroe Street <br />(xiii) St Joseph Street & Western Avenue <br />(xiv) St Joseph Street & Wayne Street <br />(xv) St Joseph Street & Jefferson Boulevard <br />(xvi) St Joseph Street & Washington Street <br />(xvii) St Joseph Street & Colfax Avenue <br />(xviii) St Joseph Street & LaSalle Avenue <br />(xix) Michigan Street & South Street (NEW) <br />(xx) Michigan Street & Central Fire Station (NEK9 <br />3. Painting of pedestrian crossing poles, pedestrian pedestals, mast arms, mast arm poles, <br />traffic signal heads and pedestrian signal indications will be paid for at the contract unit <br />price for each intersection, complete and in place. The cost of all labor, material, and <br />equipment necessary to complete the Work shall be included in the contract unit price for <br />PAINTING TRAFFIC SIGNALS (Each) measured on a per intersection basis. <br />CL)OO(ll. STRAIN POLES (NEK9 <br />A. Prevailing Specification: 2016, INDOT Standard Specifications Sections 805 and 922 <br />B. Additions: <br />1. All new strain poles shall be per current INDOT Standard Drawings and shall have a painted <br />black finish per Specification CLXIX. Strain pole foundations shall be provided per the current <br />INDOT Standard Drawings. <br />2. New strain poles shall provide 15ft luminaire arm as indicated in the plans for purposes of <br />supporting traffic detection cameras. Said arm shall be per current INDOT Standard Drawings <br />and shall be finished to match the strain pole. <br />
The URL can be used to link to this page
Your browser does not support the video tag.