My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:53:23 PM
Creation date
8/30/2016 1:50:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 16 <br />O 1e- ay to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Conversion Division B <br />Project No. 116-001 <br />SUBJECT: EWA 012 Grooving for Pavement Markings <br />ISSUE DATE: July 10, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a <br />part of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Add pay item 'GROOVING FOR PAVEMENT MARKINGS' per INDOT Design <br />Memo 15-19 requested on Division B of Contract 116-001. Work to be performed <br />according to INDOT RSP 808-T-210. This results in a $49,775.42 cost change for <br />Division B. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />IfIDDDIING AND CONTRACT REQUIREMFuTS <br />1. Bid/Proposal Form: <br />Division B: <br />Add 29,675 LFT to Line Item 464: GROOVING FOR PAVEMENT MARKINGS, 29,850 <br />LFT @ $1.39/LFT for a total addition of $41,491.5 <br />Add 1 ea. to line Item 465: ADDITIONAL MOBILIZATION, (for grooving) 1 LSM @ <br />$8,283.92 <br />SPECIFICATIONS:__ <br />NO CHANGE REQUIRED <br />Sheet 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.