My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:53:23 PM
Creation date
8/30/2016 1:50:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 09 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />d. The Contractor shall coordinate maintenance of traffic with the City for any sidewalk, <br />streetscape, trees, pavers, and/or landscaping activities following the intermediate <br />completion date for any subsequent work. <br />3. The table below lists the dates by which the identified roads shall be available to begin full <br />closure and the intermediate completion dates for full road closure. <br />Roadwav <br />Starting Date for Full <br />Intermediate <br />Completion Date for <br />Closure <br />Full Road Closure <br />Intersection of Michigan Street and <br />June 6. 2016 <br />August 5, 2016 <br />Chippewa Avenue <br />Intersection of Michigan Street and <br />May 17,201 <br />September 7. 2016 <br />Bartlett Street <br />Intersection of Michigan Street and <br />Mav 17, 2016 <br />September 7, 2016 <br />Marion Street <br />a. The identified roads shall not be closed before the starting date and shall maintain a <br />minimum of two travel lanes prior to such date. <br />b. The work specified shall be arranged and prosecuted such that these roads are open <br />to traffic on or before the specified intermediate completion date. <br />4. The City, Engineer, and Contractor will hold a pre -construction meeting following award <br />of the contract. The date of the Notice to Proceed will be agreed upon at that meeting. <br />5. Contractor shall provide a schedule to the Owner prior to beginning any work on the site. <br />CLXIX. PAINTING OF TRAFFIC SIGNAL EQUIPMENT (REVISED) <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Section 805. <br />B. Additions: <br />1. All existing and proposed pedestrian crossing poles, pedestrian pedestals, mast arms, <br />mast arm poles, strain poles, traffic signal heads, and pedestrian signal indications <br />identified herein that are to remain shall be painted black with a Sherwin Williams two step <br />paint process. <br />a. The two application painting procedure shall include "Macropoxy 646" for the first <br />application and "Acrolon 218HS" for the second application. <br />b. All work shall be in accordance with the recommendations and equipment as per <br />Sherwin Williams guidelines. <br />c. The Contractor shall provide an authorized Sherwin Williams Representative on site to <br />ensure proper paint mixing, application, weather conditions, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.