My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:53:23 PM
Creation date
8/30/2016 1:50:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 09 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />The project, both Division A and Division B, will have a completion date of June 1, 2017. <br />The contract time will start when the Notice to Proceed is delivered and signed. <br />2. The project will have intermediate completion dates as listed in the table below for roads <br />open to bi-directional traffic and substantial completion of all traffic control devices <br />complete and in place. This includes all travel and parking lane asphalt and concrete <br />work, structures, curb, lighting, and permanent pavement markings complete and in place. <br />Roadway <br />Intermediate Completion Date <br />Intersection of Main Street and Chippewa <br />September 7, <br />2016 <br />Avenue <br />Main Street between Chippewa Avenue and <br />September 7, <br />2016 <br />Sample Street and between LaSalle Street and <br />Marion Street <br />Intersection of Michigan Street and Chippewa <br />September 7, <br />2016 <br />Avenue <br />Michigan Street between Chippewa Avenue <br />September 7, <br />2016 <br />and Sample Street and between LaSalle Street <br />and Angela Blvd. <br />Main Street between Sample Street and <br />October 15, 2016 <br />LaSalle Avenue <br />St Joseph/Michigan Street between Sample <br />_November 15, <br />2016 <br />Street and LaSalle Avenue <br />a. A minimum of one travel lane in each direction on each corridor street shall be open <br />to traffic on or before the specified date. Once bi-directional traffic is established on <br />each corridor street, bi-directional traffic shall be maintained on each corridor street <br />for the duration of the project. <br />b. A minimum of one travel lane shall be open to traffic during construction except <br />whereas noted in the full closure construction period. <br />c. Two (2) northbound travel lanes must be open for the duration of Saturdays on which <br />there is a home Notre Dame football game. This can be achieved either through two <br />(2) northbound travel lanes on Michigan/St. Joseph or one (1) northbound travel lane <br />on both Michigan/St. Joseph and Main St. after Main St. has been converted to bi- <br />directional traffic. The dates of concern are provided below. (REVISED) <br />(i) September loth, 2016 <br />(ii) September 171h, 2016 <br />(iii) September 24th, 2016 <br />(iv) October 151h, 2016 <br />(v) October 29th, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.