Laserfiche WebLink
Change Order No. 09 <br />One- Way to Two -Way Street Conversion <br />Division B <br />Project No. 116-001 <br />Revise EWA Line Item No. 279: "TRAFFIC SIGNAL HEAD, 5-SECTION, 12' RED, AMBER <br />GREE, AMBER ARROW, GREENARROW; from 23 EACH @ $1,450.00/EACH to 24 LFT <br />@ $1,450.00/EACH fora Total Increase of$1,450.00. ✓ <br />Revise EWA Line Item No. 288: `SIGNAL CABLE, CONTROL, COPPER 5C/14",, from 28,703 <br />LFT @ $1.8OLFT to 31,365 LFT @ $1.80/LFT for a Total Increase of $4,791.60. <br />Revise EWA Line Item No. 289: `SIGNAL CABLE, CONTROL, COPPER 7C/14",, froyn 9,204 <br />LFT @ $2.00LFT to 7,495 LFT @ $2.00/LFT for a Total Reduction of $3,418.00. ✓ <br />Revise EWA Line Item No 349: "TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, <br />24IN" from 3 184 LFT @ $5.00/LFT to 3,280 LFT @ $5.00/LFT for a Total Increase of <br />$480.00. ✓ <br />Add EWA Line Item No. 553: "SIGNAL STRAIN POLE, STEEL, 30FT7, 8 EACH @ <br />$9,374.30/EACH for a Total Increase of $74,994.40. <br />Add EWA Line Item No. 554: "SIGNAL STRAIN POLE, STEEL, 36FT , 6 EACH @ <br />$10, 964.20/EACH for a Total Increase of $65,785.20. <br />Add EWA Line Item No. 555: "SIGNAL STRAIN POLE, STEEL, INSTALL", 2 EACH @ <br />$1, 619.80/EACH for a Total Increase of $3,239.60. <br />Add EWA Line Item No. 556: "SPAN, CATENARY & TETHER", 14 EACH @ <br />$4, 368.00/EACH for a Total Increase of $61,152.00. <br />Add EWA Line Item No. 557: `DISCONNECT HANGER", 14 EACH @ $886.60/EACH for a <br />Total Increase of $12,412.40. <br />Add EWA Line Item No. 558: "SIGNAL POLE FOUNDATION, 36INX 1441N" 16 EACH @ <br />$4, 921.80/EACH for a Total Increase of $78,748.80. <br />Add EWA Line Item No. 559: "Luminaire Arm, 30ft ; 1 EACH @ $2, 646.80/EACH for a Total <br />Increase of $2, 646.80, <br />Add EWA Line Item No. 560: "Luminaire Arm, 15ft" 7 EACH @ $1,935.70/EACH for a Total <br />Increase of $13,549.90. <br />Total Change of $256,199.80 <br />SPECIFICATIONS: <br />The following special provisions have been amended or added to the Contract Documents and are <br />issued as a part of this Change Order: <br />XIV PROSECUTION AND PROGRESS (REVISED) <br />A. Prevailing Specifications: 2016, INDOT Standard Specifications Sec. 108 <br />B. Additions: <br />