My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 5 - SB One-Way to Two-Way Conversion - Div B Proj No 116-001 - Rieth Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:53:23 PM
Creation date
8/30/2016 1:50:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
One- Change Order No. <br />Way to Tavo_ 09 <br />Way Street Conversion <br />Division B <br />�► DiNG Project No. 116-001 <br />AND r pNTRACT n� <br />�cCIN �Tc <br />1 B'd/Proposal Form <br />Division B: <br />Revise EWq Line Item <br />@ $120.00/E NO' 21: "TRAFFIC <br />ACH to 2>7 EACH SIGNAL EQUIPMENT <br />Revise EW @ $120,00/EACHfor REMOVE" <br />BASE'; from Lin EACH a TOtal Reduction °f ,fry °m 250 EACH <br />Item No. 228: `SIGNPOST SQUA $3,9960,06 ✓ <br />Reduction M 907 50. i $14.50/EACH to RE �'PE 1, 888 EACH REINFORCED ANCHOR <br />Revise E @ '$14.50/EACH fora Total <br />WA Line Item No. 23g: "TESCO CABINET <br />W/R/NG, ETC. " <br />T°tallncrease offs m 21 EAC W/SINGLE S <br />2_ 5 0 . @ $6, 250. 00/EACH to 22 E q C SERVICE FOND <br />Revise H @ $6,250. NDAT/ON <br />EWA Line Item No. 240: 00/EA CH fora <br />$120. 00/EACH to 2g EACH @ STA <br />$120.00/EACH aND HOLE COVERS" <br />pV fro <br />Revise EWq Line Item No. Total Red ERS" m 38 EACH <br />$1250.00/EACH to 3 EACH 43. SIGNAL PO action of $1 080.00. @ <br />@ $1,250.00/EAC PEDESTAL, 15FT' <br />Revise EWA Line Item No. H for a Total Re frOm 7 EACH <br />$1, 050.00/EAC 250: duction of $5, 000.000 <br />H to 59 EACH HANDHOLE S/GNAL <br />Revise EWq Line Item No. @ $1'050.00/EAC ryPE 1 from 71 <br />H for a Total Reduction of @ <br />@ $185.00/EACH to 37 251' `HANDHOLE SIG 12 600. I. <br />, — <br />Revise @ $185.00/EACH or , A Increase TO GRADE" 34 <br />Revise EWq Line Item No. 257:from <br />$58500/EACH S/G/�AL P of 555.00 EACH <br />to 47EACH @ $58500/EA y oSTAL FO(/NDAT/ONA„ <br />Revise EWq Line Item a Total Reduction of from 57EACH @ <br />$880.00/EACH to 36 EACH 58. SIGNAL POLE P 5 850.00 ✓ <br />@ $880.00/EACH fora Total Reduction of <br />Revise EWq Line Item 'from 42 EACH <br />$5.20/LFT NO 261: -CONDUIT PV $5.280. ✓ @ <br />to 14,252LFT ND C 2/N, S <br />@ $520/LFT fora TOta/ CHEDULE 80,, fro <br />Revise EWq Line Item Reduction of <br />FOUNDATION, TYPE NO. 272: `SIGNAL$3.702.40. m ' 964 LFT @ <br />for a Total Reduction oA ' from 46 EACH CANTILEVER 70.00//EACH to RE <br />$24, 030. 0, ,/ DRILLED SHAFT <br />Revise EWq Line Item No. 274; LFT @ $2 670• 001EACH <br />37EACH@ $1240.00/EgC SIGNAL CANT/LEV <br />$12,400.00 % Hto27 ERST LFT@ $1,24000/EACHfora TE tRELOCAT <br />Revise H for a Total Reductio of from <br />EWA Line Item No. 275: `PAINTIFF/C <br />$3, 870.00/EACH to 21 EACH @ P IN TING <br />$3,870. N /EACH for <br />SIGNALS'; from 19 EACH @ <br />a Total Increase of IL740.00✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.