Laserfiche WebLink
Note: Schematic Design concludes with your written approval of the Schematic Design documents, <br />thus approving further development of the required documentation. <br />A1.05 Design Development (50% Submittal): <br />A. Upon approval of the Schematic Design, JPR shall prepare Design Development documents. The <br />Design Development documents will define the character and essentials of the project. The site <br />development will take into consideration the location of all existing vegetation and will make every <br />attempt to retain them. The design development drawings will be approximately 50% of the final <br />set and will serve as the basis for Construction Documents. <br />1) JPR will prepare design drawings and outline specifications utilizing the approved <br />schematic design. <br />2) JPR will facilitate up to two (2) meetings with City Staff and any other related parties to <br />discuss plans and obtain input. <br />3) JPR will facilitate one (1) public stakeholder meeting to present the updated plans and to <br />obtain input. <br />4) Additional revisions to the drawings based upon these meetings will be completed. <br />5) A preliminary estimate of probable construction costs will be further refined. <br />6) Once final approval of the Design Development design is obtained JPR will commence <br />with the development of the construction documentation. <br />JPR will prepare the necessary drawings and plans and will submit them to the Client for review <br />and approval. <br />A1.06 Construction Documents and Specifications (90% and 100% Submittal): <br />A. Upon approval of the Design Development documents, JPR will commence with the development <br />of the Construction Documents and Specifications. The Construction Documents and related <br />professional services that will be provided shall include, but are not limited to the following: <br />1) Project Meetings with Contractor, Client and Design Team <br />2) Demolition Plan — Indicating existing structures, pavements and plant material to be <br />removed. <br />3) Architectural Construction Drawings <br />4) Site Dimension Plan indicating pavement types and locations, site features, site amenities, <br />horizontal dimensions/layout. <br />5) Grading Plans <br />6) Utility Plans <br />7) Erosion Control Plans <br />8) Landscape Planting Plan and Details <br />9) Site Construction Details — Various details to support the development of the Construction <br />Documents will be provided. <br />10) Construction Specifications. <br />11) JPR will facilitate up to three (3) 2-hour meetings with City Staff. <br />12) JPR will facilitate one (1) stakeholder meeting to present the final documents and to obtain <br />any additional input from the group. <br />The site plan will be subject to the City of South Bend's project review process and will be <br />submitted accordingly. <br />(Exhibit A —Engineer's services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />