My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - JPR - Geotechnical Survey & Design for Charles Black Center Renovations
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
PSA - JPR - Geotechnical Survey & Design for Charles Black Center Renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:16:06 PM
Creation date
7/26/2016 4:20:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/26/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A1.02 GeotechnicalInvestigation: <br />A. Our proposal for the Geotechnical Investigation includes the following scope of services: <br />• Perform Soil Borings <br />• Preparation of Soil Boring Logs, including: <br />— Soil Classifications <br />— Standard Penetration Test Data <br />— Water Level Information <br />Preparation of Geotechnical Investigation Report, including but not limited to <br />Recommendations on: <br />— Allowable Soil Bearing Pressure <br />— Concrete Pavement Thickness <br />— Sub -base Compaction <br />This proposal is based upon performing a total of five (5) additional borings. Four (4) borings are <br />to be within the proposed building footprint to a depth of 30' below ground surface. Two (2) <br />borings are to be located within the existing lower level parking lot. For all soil borings, standard <br />split spoon penetration/blow count tests are to be performed at 1.5' intervals within the initial 10' <br />below the ground surface, and at 5' intervals below the initial 10' of depth. <br />The report would consider the encountered ground water levels and soils for recommendations on <br />foundation type, and a range of allowable soil bearing pressures for foundation possibilities, as well <br />as geotechnical parameters and recommendations for general site development. This proposal does <br />not include participation in the actual foundation design engineering, or construction inspection, or <br />construction material testing, though JPR would gladly quote on geotechnical design and <br />construction inspection upon review of a specific project scope. <br />A 1.03 Conceptual Design (Previously Provided): <br />A. JPR will work with the South Bend Parks and Recreation Department to develop a preliminary <br />conceptual design for both building and site development. This service will also include a <br />Preliminary Opinion of Probable Cost, meetings with City staff, and will make the necessary plan <br />revisions. It is understood that this work will be utilized by the City for funding purposes. <br />A1.04 Schematic Design (35% Submittal): <br />A. Schematic Design plan refinement from Owner's concept/program and Owner review. <br />B. JPR will facilitate up to two (2) 2-hour meetings with City of South Bend Staff. <br />C. JPR will facilitate one (1) public stakeholder meeting to present the Schematic Design and obtain <br />input. <br />D. Development of final Schematic Design drawings on CAD system for Owner approval, design sign <br />off, and preliminary detail of preliminary Opinion of Probable Cost, and with deliverables as <br />follows: <br />1) Floor Plans with door, window, and furniture placement. <br />2) Exterior elevations (4 sides). <br />3) Site Plan. <br />4) Preliminary 3-D models of exterior and interior of structure. <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright c0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.