My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/25/06 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2006
>
09/25/06 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2007 10:58:17 AM
Creation date
10/17/2007 10:56:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/25/2006
Document Relationships
09/25/06 Board of Public Works Regular Meeting Agenda
(Supersedes)
Path:
\Public\Public Works\Agendas\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i:, ~. <br />REGULAR MEETING SEPTEMBER 25, 2006 <br />SELGE CONSTRUCTION-COMPANY INC. <br />2833 South 11 Street <br />Niles, Michigan 49120 <br />Bid was signed by: Mr. John M. Szuba <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $196,316.00 <br />NORTHERN CONSTRUCTION SERVICES, CORP. <br />Post Office Box 1299 <br />Niles, Michigan 49120 <br />Bid was signed by: Mr. Daniel L. Kulwicki <br />Non-Collusion Affidavit was in order <br />Non-Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $267,389.50 <br />The Bid of Ortiz Concrete did not contain Bid Security, therefore, was not read. <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks, and carried, the above bids <br />were referred to the Division of Engineering and Community and Economic <br />Development for review and recommendation. After reviewing those bids, Mr. Jason <br />Durr, Engineering, recommends that the Board award the project to the lowest responsive <br />and responsible bidder, L.L. Geans, 1923 North Home Street, Mishawaka, Indiana in the <br />amount of $174,820.00. Therefore, Mr. Inks made a motion that the recommendation be <br />' accepted and the bid be awarded as outlined above. Mr. Littrell seconded the motion, <br />which carried. <br />BID OPENING/AWARD BID -MIAMI STREETSCAPES -MIAMI STREET FROM <br />INDIANA AVENUE TO BROADWAY STREET - CURB,_ SIDEWALKS, <br />APPROACHES AND LIGHTING - PROJECT NO. 106-045 <br />This was the date set for receiving and opening of sealed bids for the above referred to <br />project. The Clerk tendered proofs of publication of Notice in the South Bend Tribune <br />and the Tri-County News, which were found to be sufficient. The following bids were <br />opened and publicly read: <br />SELGE CONSTRUCTION COMPANY INC. <br />2833 South I1 Street <br />Niles, Michigan 49120 <br />Bid was signed by: Mr. John M. Szuba <br />Non-Collusion Affidavit was'in order <br />Non-Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: Base Bid: $132,117.00 <br />Alternate A $ 34,950.00 <br />TOTAL BID: $167,067.00 <br />RIETH-RILEY CONSTRUCTION COMPANY. INC. <br />25200 State Road 23 <br />Post Office Box 1775 <br />South Bend, Indiana 46634 <br />~~~ <br />Bid was signed by: Mr. Todd J. Kulczar <br />
The URL can be used to link to this page
Your browser does not support the video tag.