|
REGULAR MEETING ~ MAY 22, 2006 = t-
<br />.~
<br />J111.i Lit - 111i1V J11VV 1V1V 1-Ai\ivlu tX. \iaWUa ira(11V Va\ ali\L au ra avi
<br />IMPROVEMENTS -PROJECT NO. 105-013 (SEWER BOND)
<br />In a memorandum to the Board, Mr. Jason Durr, Engineering, requested permission to
<br />advertise for the receipt of bids for the above referred to project, Mr. Durr advised that
<br />the Title Sheet for the above referred to project was being presented at this time for
<br />execution. Therefore, upon a motion made by Mr. Inks, seconded by Mr. Littrell, the
<br />reggest to advertise anc~..the Title Sheet were approved.
<br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS/TITLE
<br />SHEET -LASALLE AREA PUBLIC WORKS PROJECT - 1800-2100 HUMBOLDT
<br />STREET - PROJECT NO. 106-039 (CDBG)
<br />In a memorandum to the Board, Mr. Jason Durr, Engineering, requested permission to
<br />advertise for the receipt of bids for the above referred to•project. ' Mr. Durr advised that
<br />the Title Sheet for the above referred to project was being presented at this time for
<br />execution. Therefore, upon a motion made by Mr. Inks, seconded by Mr. Littrell, the
<br />request to advertise and the Title Sheet were approved.
<br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS/TITLE
<br />SHEET -NEAR WEST SIDE PUBLIC WORKS PROJECT - 200-300 HUEY STREET
<br />-PROJECT NO. 106-040 (CDBG
<br />In a memorandum to the Board, Mr. Jason Durr, Engineering, requested permission to
<br />advertise for the receipt of bids for the above referred to project. Mr. Durr advised that
<br />the ,Title Sheet for the•,above referred to project was being presented at this time for
<br />execution. Therefore, upon a motion made by Mr. Inks, seconded by Mr. Littrell, the
<br />request to advertise and the Title Sheet were approved.
<br />APPROVAL OF REOUEST TO ADVERTISE FOR THE RECEIPT OF BIDS/TITLE
<br />SHEET -LASALLE PARK MODEL BLOCK - 1.00-200 NORTH WELLINGTON
<br />STREET - PROJECT NO. 106-041 (CDBG
<br />In a memorandum to the Board, Mr. Jason Durr, Engineering, requested permission to
<br />advertise for the receipt of bids for the above referred to project. Mr. Durr advised that
<br />the Title Sheet for the above referred to project was being presented at this time for
<br />execution. Therefore, upon a motion made by Mr. Inks, seconded by Mr. Littrell, the
<br />request to advertise and the Title Sheet were approved.
<br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS/TITLE
<br />SHEET - OLIVER GATEWAY NEIGHBORHOOD PUBLIC WORKS - 800 BLOCK
<br />WALNUT - PROJECT NO. 106-042 (CDBG)
<br />In a memorandum to the Board, Mr. 7ason Durr, Engineering, requested permission to
<br />advertise for the sale of bids for the above referred to project. Mr. Durr advised that the
<br />Title Sheet for the above referred to project was being presented at this time for
<br />execution. Therefore, upon a motion made by Mr. Inks, seconded by Mr. Littrell, the
<br />request to advertise and the Title Sheet were approved.
<br />APPROVAL OF REQUEST TO REJECT ALL BIDS AND RE-ADVERTISE FOR THE
<br />RECEIPT FO BIDS -TWO HUNDRED FORTY-EIGHT X248) MORE OR LESS,
<br />FIREFIGHTERS PROTECTIVE CLOTHING (EMERGENCY MEDICAL SERVICES
<br />CAPITAL IMPROVEMENT FUND N0.288/2005 FIRE GRANT AWARD)
<br />In a memorandum to the Board, Chief Luther Taylor, Fire Department, requested
<br />permission to reject all bids received on May 8, 2006, for the above items. Chief Taylor
<br />requests permission to re-advertise for the receipt of bids. Therefore, upon a motion
<br />made by Mr. Littrell, seconded by Mr. Inks, the above request was approved.
<br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS -
<br />REFURBISH ONE (lj 1995 AND ONE (~ 1992 PIERCE ARROW PUMPER -FIRE
<br />DEPARTMENT
<br />In a memorandum to the Board, Chief Luther Taylor, Fire Department, requested
<br />permission to advertise for the receipt of bids for the above referred to service.
<br />Therefore, upon a motion made by Mr. Inks, seconded by Mr. Littrell, and carried, the
<br />above request was approved.
<br />
|