Laserfiche WebLink
Section VI. Chapter 18, Article 2, Section 18-22 of the South Bend Municipal Code, is hereby <br /> amended by adding the following new subsection(e)which shall read in its entirety as follows: <br /> fel City-funded or City Utilities-funded public improvement construction projects shall not <br /> be subject to City excavation fees; however, the contractor or City department doing any <br /> such construction work must apply and receive approval for excavation permits as <br /> described in Section-18-25. <br /> Section VII. Chapter 18, Article 2, Section 18-24 of the South Bend Municipal Code, is <br /> hereby amended to read in its entirety as follows: <br /> Sec. 18-24.—Excavation permit; fee. <br /> Any person desiring to make an opening or excavation contemplated by this article shall pay <br /> to the City of South Bend,Indiana for the permit required by Section 18-22 the following: <br /> (a) Excavation of 100 linear feet or less, and for each tunnel opening: <br /> 1. In Roadway Pavement: $200 (two-hundred dollars). <br /> 2. Outside of Roadway Pavement: $25 (twenty-five dollars). <br /> (b) An additional charge of$25 (twenty-five dollars) required for each additional 100 linear <br /> feet. <br /> Section VIII. Chapter 18, Article 2, Section 18-27 of the South Bend Municipal Code, is <br /> hereby amended to read in its entirety as follows: <br /> Sec. 18-27.—Restoration of surface; specifications. <br /> (a) Any person making any opening or excavation or causing the same to be made in any <br /> street shall be required to replace all excavated material and pavement as herein set forth <br /> in the City Standards and Specifications as adopted by the Board of Public Works. <br /> entitled "Strcct Excavation Repair 1961." A copy of the relevant standards and <br /> specifications shall be attached to each permit issued. <br /> (b) This specification is set forth as follows: <br /> "Street Excavation Repair 1961 <br /> South Bend, Indiana <br /> "Whereas: The Board of Public Works and Safety deems it necessary to <br /> pavement disturbed as a result of making an opening or excavation in any street, <br /> these specifications are set forth and the compliance therewith shall be a <br /> requirement of obtaining a permit for said opening or excavation under the <br /> provisions of Article 2 of this chapter. It shall be the obligation of any person, <br /> firm or corporation obtaining a permit for an opening or excavation in the public <br /> right of way to backfill the excavation and replace the pavement as set forth in <br /> these specifications." <br /> 4 <br />