My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-15 Agenda, Packet & Committee Meeting Notice
sbend
>
Public
>
Common Council
>
Committee Meeting Notices
>
2015
>
10-12-15 Agenda, Packet & Committee Meeting Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 3:25:05 PM
Creation date
10/8/2015 11:32:51 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Agendas
City Counci - Date
10/12/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(c) Other nonrecurring charges: <br /> Disconnect for nonpayment 11.00 <br /> Reconnection 8.00 <br /> Bad checks 20.00 <br /> Frozen meter(1" and smaller) 40.00 <br /> Building authorization fee 50.00 <br /> Service initiation 20.00 <br /> Meter downsize (1" and smaller) 32.00 <br /> Inspection and testing fee for backflow prevention devices; 1.5" or smaller 50.00 <br /> Inspection and testing fee for backflow prevention devices; 2" and larger 75.00 <br /> Damaged or lost meter, at cost depending upon size and type of meter. <br /> Return trip 15.00 <br /> Unauthorized use of water system 200.00 <br /> Section IV. Chapter 17, Article 12, Section 17-113(d) of the South Bend Municipal Code, <br /> shall be amended to read as follows: <br /> Sec. 17-113. Site development permit. <br /> (d) Each ESCP submittal shall include the name, address and phone number of the owner or <br /> developer of the site and any consulting firm retained by the applicant together with the <br /> name of the applicant's principal contact at such firm. It shall also include a statement <br /> by the owner or developer of the site that any land clearing, construction, or ' <br /> development involving the movement of earth by any party on the project site shall be <br /> in accordance with the approved ESCP.Each ESCP shall be accompanied by a non- <br /> refundable one hundred dollars ($100.00) filing-permit review fee per acre of disturbed <br /> land up to $1,000 dollars made payable to the City of South Bend, Indiana. Partial acres <br /> are always rounded up(e.g. 2.1 acres). The separate ECSP non-refundable filing fee is <br /> $100.00). <br /> Section V. Chapter 18, Article 2, Section 18-20(a) of the South Bend Municipal Code, is <br /> hereby amended to read in its entirety as follows: <br /> Sec. 18-20. Obstructing free passage of streets; exception; permit required. <br /> (a) No person by any means or in any manner shall collect together vehicles or any substance <br /> or materials so as to obstruct the free passage or use of any street. All temporary <br /> occupancy of public property as hereinafter provided for shall be considered and treated <br /> as being at the will of the City, and will be permitted only by special permit issued by the <br /> City Engineer as defined in Chapter 18,Article 7 of the South Bend Municipal Code. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.