My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/23/2015 Agenda Review
sbend
>
Public
>
Public Works
>
Minutes
>
2015
>
07/23/2015 Agenda Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:54:43 PM
Creation date
8/13/2015 8:11:49 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
7/23/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA REVIEW MEETING JULY 23, 2015 242 <br />ALLTRA CORPORATION <br />PO Box 370, 1600 Partridge Rd <br />Dewey, OK 74029 <br />Bid was signed by: Jon W. Arrowsmith <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />BID: $595,811.00 <br />KOIKE ARONSON INC. <br />635 W. Main Street <br />Arcade, NY 14009 <br />Bid was signed by: Thomas Calabrese <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />BID: $777,000.00 <br />Upon a motion made by Mr. Relos, seconded by Ms. Maradik and carried, the above bids were <br />referred to Engineering and Community Investment for review and recommendation. <br />OPENING OF QUOTATIONS — LAFAYETTE FALLS SUBDIVISION PAVEMENT — <br />PROJECT NO. 115-086 <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, IN 46614 <br />Quotation was submitted by Dustin Hilary <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />QUOTATION: $152,625.00 <br />RIETH-RILEY CONSTRUCTION CO. INC <br />25200 State Road 23 <br />South Bend, IN 46360 <br />Quotation was submitted by Angelo Mazzocchi <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />QUOTATION: $133,210.05 <br />Upon a motion made by Ms. Maradik, seconded by Mr. Relos and carried, the above Quotations <br />were referred to Engineering for review and recommendation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.