My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amending Ordinance No. 1808 with Reference to a Plumbing Code
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1936
>
Amending Ordinance No. 1808 with Reference to a Plumbing Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2015 4:22:59 PM
Creation date
6/17/2015 9:47:07 AM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
10/12/1936
Ord-Res Number
3190-36
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-43- <br />on the sewer side of any trap. All other joints shall be <br />caulked, screwed, or wiped. Soldering nipples, brass <br />unions, galvanized box unions with sheet lead gaskets, made <br />without other gaskets or packing, or with long threaded <br />unions are permitted. No union shall be used under floors <br />on waste or vent pipes. <br />Section CLXIV. Slip joints shall not be permitted <br />within any part of the water supply system. <br />Section CLXV. That all persons doing any work within <br />the terms of this ordinance shall also abide by any rules <br />established by the Board of Public works regulating the <br />Water Department, which are not in conflict with this <br />ordinance. <br />Section CLXVI. All plumbing and house drainage shall <br />be inspected by said Inspector as follows: <br />When the soil waste pipe or vent stack are completed <br />throughout the building, and before any joint in such soil <br />waste pipe or vent stack or fittings are covered, and whin <br />all openings are made for the proper connection of all <br />fixtures all soil waste pipes or vent stacks shall be filled <br />with water to the highest .point or to the highest point <br />above the vents. This shall be the first test made by the <br />Plumbing Inspector and he shall be notified that the work <br />is ready for inspection by written notice filed with him <br />by the employing plumber. <br />Final inspecton shall be made when all fixtures are <br />attached and the work is completed and the water turned on <br />and all traps filled. If this last mentioned test meets <br />with the approval of the Plumbing Inspector and with the <br />various sections of this Ordinance,, then the Inspector <br />shall issue his certificate of approval to the proper per- <br />sons, which said certificate shall properly identify the <br />work and shall be issued before the water meter is set. <br />
The URL can be used to link to this page
Your browser does not support the video tag.