Laserfiche WebLink
REGULAR MEETING <br />APRIL 28.2015 128 <br />Bid was signed by: Dustin Ililary, Area Manager <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />DDivsion 1 <br />$650,737.01 <br />ivision2 <br />1 $1,102,627.95 <br />Division 3 <br />1 $1,149,685.78 <br />Upon a motion made by Ms. Roos, seconded by Ms. Maradik and carried, the above bids were <br />referred to Engineering and Community htvestment for review and recommendation. <br />OPENING OF QUOTATIONS — INGROUND HOISTS REPLACEMENT (CENTRAL <br />SERVICES CAPITAL) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotations were opened and read: <br />RIDGE COMPANYMDGE NAPA AUTO PARTS <br />1535 S. Main St. <br />South Bend, IN 46613 <br />Quotation was submitted by John Foster. <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Indiana Local Business Preference Claim submitted <br />Est. <br />Q - <br />Item <br />Manufacturer <br />Unit Price <br />Total <br />2 <br />Removal and Installation <br />R. H. Lowan <br />of In Ground Hoist <br />Labor <br />$ 7,800.00 <br />2 <br />EV 1220 Challenger <br />In Ground Hoists <br />$10,198.00 <br />$20,396.00 <br />TOTAL <br />$28,196.00 <br />OTT EQUIPMENT SERVICE, INC. <br />517 IIerriman Ct. <br />Noblesville, IN 46060 <br />Quotation was submitted by Erich W. Goebes. <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United Slates Steel Products or <br />Foundry Products was submitted. <br />Est. <br />Q <br />Item <br />Manufacturer <br />Unit Price <br />Total <br />2 <br />RemovalGrounandd Installation <br />ROTARY <br />of In Hoist <br />LIFT <br />$16,130.99 <br />$32,261.98 <br />Upon a motion made by Mr.. Gilot, seconded by Ms. Roos and carried, the above Quotations <br />were referred to Equipment Services for review and recommendation. <br />AWARD BID — IGNITION PARK INFRASTRUCTURE PHASE 1C — PROJECT NO. 114- <br />063B (RWDA TIF) <br />Mr. Corbitt Kerr, Engineering, advised the Board that on April 9, 2015, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Kerr recommended that <br />the Board award the contract to the lowest responsive and responsible bidder Majority Builders, <br />