Laserfiche WebLink
REGULAR MEETING <br />APRIL 28 2015 127 <br />De ducttoprovide Screenings Conveyor <br />(Specification Section 41 21 23) and <br />I <br />Screenings Compactor (Specification <br />LS <br />N/A <br />N/A <br />Section 46 24 21) by Alternate <br />Manufacturer Name: <br />Bid Alternate <br />Deduct Total <br />MANDATOR YBID ALTERNATES —DEDUCT <br />Item No. <br />Deseri tion <br />uantity <br />Unit Price <br />Total <br />I <br />Provide Carbon Steel Grit Cyclones <br />LS <br />N/A <br />$ 22,00 <br />(Specification Section 46 23 27A) <br />2 <br />Provide Carbon Steel Grit Washers <br />LS <br />N/A <br />$ 16,000 <br />(Specification Section 46 23 65A <br />3 <br />Deduct Grit Collector Steel Replacement <br />LS <br />NA <br />(Specification Section 46 23 12) <br />$ 93,000 <br />4 <br />Deduct Grit Collecting Equipment <br />LS <br />NA <br />Rehabilitation (Specification Section 46 23 <br />S137,000 <br />12) <br />5 <br />Deduct Mechanical Screen Covers <br />LS <br />NA <br />(Specification Section 46 23 12, Paragraph <br />S 91,00 <br />3.1-E.) <br />Mandatory Bid <br />$359,00 <br />Alte mate Deduct <br />Upon a motion made by Ms. Roos, seconded by Mr. Relos and carried, the above bids were <br />referred to Engineering for review and recommendation. <br />OPENING OF BIDS — BARTLETT STREET, PHASE 1 & MEMORIAL NORTH PARKING <br />LOT — PROJECTS NO. 114-032A AND NO 114-047 (2015 TIF INFRASTRUCTURE BOND <br />& MEDICAL TIF) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />RIETH-RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />South Bend, IN 46614 <br />Bid was signed by: Christopher L. Weinkauf <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Tnvestment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Five percent (5%) Bid Bond was submitted. <br />BID: <br />Division 1 <br />$551,583.75 <br />Division 2 <br />$849,328.55 <br />Division 3 <br />$1,057,539.12 <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, TN 46614 <br />