Laserfiche WebLink
REGULAR MEETING APRIL 14.2015 109 <br />recommendation be accepted and the bid be awarded as outlined above. Mr. Eleuthera seconded <br />the motion, which carried. <br />TABLE BID AWARD — DEMOLITION OF 87 MORE OR LESS, VACANT AND <br />ABANDONED HOUSES —PROJECT NO 115 -012 (LOSS RECOVERY FUND) <br />Mr. Michael Carey, Engineering, requested the Board table this request at this time. Therefore, Mr. <br />Pawlowski made a motion that the award of the bid be tabled. Mr. Relos seconded the motion, <br />which carried. <br />AWARD BID — IGNITION PARK INFRASTRUCTURE — PHASE 1C — PROJECT NO. 114- <br />_ 063A (RIVER WEST DEVELOPMENT AREA I-IF) <br />Mr. Corbitt Kerr, Engineering, advised the Board that on April 9, 2015, bids were received and <br />opened for the above referenced project. After reviewing those bids, Mr. Kerr recommended that <br />the Board award the contract to the lowest responsive and responsible bidder Walsh & Kelly, Inc. <br />24358 State Road 23, South Bend, Indiana, in the amount of $3,651,618.51 with Alternates B, D, <br />and E. Therefore, Mr. Relos made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Mr. Henthoru seconded the motion, which carried. <br />REJECT PROPOSALS — EQUIPMENT PURCHASE FOR NOIRE DAME TURBO AT <br />IGNITION PARK, CLOSED CIRCUIT EVAPORATIVE COOLERS — PROJECT NO. 114 - <br />083D (RIVER WEST DFVELOPMENT ARFA TI, F� <br />Mr. Michael Carey, Engineering, advised the Board that on April 9, 2015, two (2) proposals were <br />received and opened for the above referenced project. After reviewing those proposals, Mr. Carey <br />recommended that the Board reject both of the proposals due to neither vendor meeting the <br />specifications regarding the minimum performance requirements. Therefore, Mr. Gilot made a <br />motion that the recommendation be accepted and the proposals be rejected as non - responsive to <br />the bid specifications. Mr. Relos seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 1 — DEMOLITION OF 118 MORE OR LESS VACANT & <br />ABANDONED HOMES — PROJECT NO 114 -073C (LOSS RECOVERY) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. I on behalf of <br />Torok Excavating, 825 Fellows Street, South Bend, Indiana 46601, indicating the Contract amount <br />be increased by $15,160 for anew Contract sum in the amount of $444,151. Upon a motion made <br />by Mr. Henthoru, seconded by Mr. Relos and carried, the Change Order was approved <br />APPROVE CHANGE ORDER NO. 1 — DEMOLITION OF 118 MORE OR LESS VACANT & <br />ABANDONED HOMES — PROJECT NO 114 -073A (LOSS RFCOVERYI <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted. Change Order No. 1 on behalf of <br />Selge Construction, 2833 South I la' Street, Niles, Michigan 49120, indicating the Contract amount <br />be decreased by $34,669 for a new Contract sum in the amount of $396,094. Upon a motion made <br />by Mr. Relos, seconded by Mr. Henthoru and carried, the Change Order was approved <br />APPROVE AMENDED CHANGE ORDERS NOS. 1 AND 2 — SOUTHWOOD SEWER <br />PROJECT — PROJECT NO 112 -042 (2011 SEWER BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted amended Change Orders Nos. 1 <br />and No. 2 on behalf of Walsh & Kelly Construction, Inc., 24358 State Road 23, South Bend, <br />Indiana 46614, indicating the Contract amount be increased by $120,000.00 for Change Order No. <br />I for an amended contract amount of $2,071,843.55 and decreased in the amount of $62,982.06 for <br />an amended Contract sum in the amount of $2,008,861.49. Mr. Villa explained the previous two <br />(2) Change Orders were submitted based on a local preference bid amount, not the actual contract <br />amount awarded. He noted the Change Order amounts were correct, he just needed to correct the <br />total contract amounts for the record. Upon a motion made by Mr. Gilot, seconded by Mr. <br />Henthom and carried, the amended Change Orders were approved as noted. <br />APPROVE CHANGE ORDER NO I (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />WEST WASHINGTON STREET LIGHTS — PROJECT NO. 114 -044 COIT <br />Mr. Gilot advised that Mr. Toy Villa, Engineering has submitted Change Order No. 1 (Final) on <br />behalf of Michian Contracting, Inc., P.O. Box 929, Plymouth, Indiana 46563, indicating the <br />contract amount be increased by $8,789.10 for a new contract sum, including this Change Order, <br />of $78,684.10. Additionally submitted was the Project Completion Affidavit indicating this new <br />final cost of $78,684.10. Upon a motion made by Mr. Relos, seconded by Mr. Henthom and <br />carried, Change Order No. 1 (Final) and the Project Completion Affidavit were approved. <br />