Laserfiche WebLink
1 <br /> i <br /> I <br /> E. 90% Final Check Plans shall be developed by the Engineer after Owner review of the <br /> 60% <br /> submission and comments received from the Public Information meeting. The Engineer shall <br /> complete the following items within these project limits and for further development of the <br /> prepared Road Plans: <br /> 1. Review with the Owner received comments from the Public Information meeting and <br /> identify any proposed changes in the project. <br /> 2. Finalize project Drainage Design <br /> 3. Finalize Title and Index Sheet(s) <br /> 4. Finalize Typical Sections <br /> 5. Finalize Plan and Profile Sheets <br /> 1 <br /> 6. Finalize Geometric Tie up sheet <br /> 1 7. Finalize Plat Sheet <br /> 1 <br /> I8. Finalize Roundabout and Intersection Details <br /> 9. Finalize Maintenance of Traffic Plans <br /> i <br /> 4 10. Finalize Construction Details <br />, <br /> 11. Final Lighting Plans <br /> �E <br /> 12. Final Signal Layout(s) <br /> 13. Finalize Landscape Plan <br /> I <br /> 14. Finalize Pavement Marking Plans <br /> 15. Final Erosion Control Plans <br /> 16. Complete Sign Details <br /> 17. Complete Approach/ Structure/Misc. Tables <br /> 18. Finalize Cross Sections <br /> 19. Complete and bind Quantity Calculations for use by the Owner <br /> 20. Finalize and prepare finalized Estimate of Probable Construction Costs <br /> 21. Complete necessary Special Provisions <br /> Page 6 <br /> (Exhibit A—Engineer's Services) <br /> EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br /> Copyright©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />