My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3226 approving and authorizing the execution of an Addendum to the Master Agency Agreement (Michigan & Chippewa Intersection Modification Project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3226 approving and authorizing the execution of an Addendum to the Master Agency Agreement (Michigan & Chippewa Intersection Modification Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 12:15:54 PM
Creation date
8/29/2014 12:15:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> i <br /> I <br /> E. 90% Final Check Plans shall be developed by the Engineer after Owner review of the <br /> 60% <br /> submission and comments received from the Public Information meeting. The Engineer shall <br /> complete the following items within these project limits and for further development of the <br /> prepared Road Plans: <br /> 1. Review with the Owner received comments from the Public Information meeting and <br /> identify any proposed changes in the project. <br /> 2. Finalize project Drainage Design <br /> 3. Finalize Title and Index Sheet(s) <br /> 4. Finalize Typical Sections <br /> 5. Finalize Plan and Profile Sheets <br /> 1 <br /> 6. Finalize Geometric Tie up sheet <br /> 1 7. Finalize Plat Sheet <br /> 1 <br /> I8. Finalize Roundabout and Intersection Details <br /> 9. Finalize Maintenance of Traffic Plans <br /> i <br /> 4 10. Finalize Construction Details <br />, <br /> 11. Final Lighting Plans <br /> �E <br /> 12. Final Signal Layout(s) <br /> 13. Finalize Landscape Plan <br /> I <br /> 14. Finalize Pavement Marking Plans <br /> 15. Final Erosion Control Plans <br /> 16. Complete Sign Details <br /> 17. Complete Approach/ Structure/Misc. Tables <br /> 18. Finalize Cross Sections <br /> 19. Complete and bind Quantity Calculations for use by the Owner <br /> 20. Finalize and prepare finalized Estimate of Probable Construction Costs <br /> 21. Complete necessary Special Provisions <br /> Page 6 <br /> (Exhibit A—Engineer's Services) <br /> EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br /> Copyright©2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.