My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3226 approving and authorizing the execution of an Addendum to the Master Agency Agreement (Michigan & Chippewa Intersection Modification Project)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3226 approving and authorizing the execution of an Addendum to the Master Agency Agreement (Michigan & Chippewa Intersection Modification Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2014 12:15:54 PM
Creation date
8/29/2014 12:15:48 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I -- <br /> 1 ' i <br /> i 22. Submit 90% Final Check Plans and Estimate of Probable Construction Costs to the Owner <br /> for review. I <br /> 1 <br /> 1 C <br /> 1 23. Conduct a review meeting with the Owner to receive 90%Plan comments. <br /> 24. Update 90%Plans from review meeting <br /> i <br /> 1 F. The Engineer shall prepare and secure an Indiana Department of Environmental Management <br /> 1 (IDEM) Construction/Land Disturbance (Rule 5 Erosion Control) Storm Water Permit. The <br /> following shall be completed to secure this permit by the Engineer and its Consultants: <br /> 1. Submit Plans to the St. Joseph County MS4 for review. <br /> t <br /> 2. Prepare advertisement for publishing by the Owner <br /> 3. Prepare the Rule 5 Notice of Intent(NOI) Submittal , <br /> 4. Submit permit application to IDEM. <br /> G. Bidding Documents shall be prepared by the Engineer after acceptance by the Owner of 90% <br /> Final Check Plans, revised Estimate of Probable Construction Costs, and any other deliverables <br /> subject to any Owner-directed modifications or changes in the scope, extent, character, or <br /> design requirements of or for the Project, and upon written authorization from Owner, <br /> Engineer shall: <br /> C1. Prepare finalized Drawings and Special Provisions indicating the scope, extent, and <br /> character of the Work to be performed and furnished by Contractor. If appropriate, Special <br /> Provisions shall conform to the Owner Standard Specification and other cited governing <br /> Standard Specifications. <br /> 2. Advise the Owner of any adjustments to the Estimate of Probable Construction Cost known <br /> to Engineer from changes made at 90%Plan Review. <br /> 3. Finalize and make available to the Owner the Project(s) Cover Sheet for necessary <br /> signatures. <br /> 4. Develop and prepare Bidding Documents for use by the Owner in Adobe Acrobat digital <br /> file format. <br /> 5. Final project advertisement and bid packages for use by the Owner. ■ <br /> ; <br /> 1 <br /> C 1 <br /> It <br /> is <br /> I <br /> [ <br /> Page 7 1 <br /> (Exhibit A—Engineer's Services) t <br /> k <br /> EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br /> Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.