Laserfiche WebLink
page 9. <br />he or they shall pay the above fee with a penalty of $5.00 <br />and the payment of such penalty shall not release him or <br />them from other penalties provided for in this Ordinance. <br />D. It shall be unlawful for any licensee to secure a permit under <br />his or his firms name to enable any person not a bona -fide <br />employee or person or firm holding a license to do warm air <br />heating, residential air conditioning or ventilating work. <br />Said viole.tion shall be considered as sufficient grounds <br />for revocation of license. <br />SECTION 18. INSP -CTION i;ND CERTIFICLTES. <br />Upon completion of any installation of warm air heating, residential <br />air conditioning or ventilating equipment or system which has been made <br />under a permit, it shall be the duty of the person, firm or corporation <br />making the installation to notify the Inspector, who shall inspect the <br />installation within forty -eight (48) hours, exclusive of Saturdays, Sundays <br />and holidays, of the time such notice is given or as soon thereafter as <br />practicable. <br />When the Inspector finds the installation to be in conformity with <br />the provisions of this Ordinance, he shall attach to the equipment a <br />certificate of approval in the form of a four (4) section tag, three <br />sections of which shall be perforated for removal. The owners section <br />shall remain attached to the equipment. Section one shall be removed <br />by the Inspector and retained in file for a permanent record of inspect- <br />ion. Section two shall be removed by fuel supplier as authority to <br />supply fuel for the equipment. Section three shall be removed by the <br />installing contractor (Class "! °) for his records. Each section shall <br />bear the same serial number and address. Section one to be signed by the <br />person removing sections two, three and four. <br />When temporary certificate of approval is issued authorizing the <br />connection and use of the equipment for emergency use, such certificates <br />shall be issued to expire at a time to be stated thereon and shall be <br />revocable by the Inspector. <br />14hen any warm air heating, residential air conditioning and ventilating <br />equipment is to be hidden from view by the permanent placement of parts <br />of the building, the person, firm or corporation installing the equipment <br />shall notify the Inspector, and such equipment shall not be concealed until <br />it has been inspected, and approved by the Inspector; provided that on <br />large installations where the concealment of equipment proceeds continuously, <br />the person, firm or corporation installing the equipment shall give the <br />Inspector due Notice and inspections shall be made periodically during <br />the progress of the work. <br />If, upon inspection) the installation is not found to be fully in <br />conformity with the provisions of this Ordinance the Inspector shall at <br />once forward to the person, firm or corporation making the installation, <br />notice to make the necessary correction within 48 hours and call for <br />re- inspection. <br />SECTION 19. CONNECTIONS TO INSTILLdTIONS. <br />It shall be unlawful for any person, firm or corporation to make <br />connection for a supply of coal, oil or gas or to supply coal, oil or <br />gas to any warm air heating equipment for the installation of which a permit <br />is required or which has been disconnected or ordered to be disconnectedt <br />by the Inspector, or until approval has been issued by the Inspector, <br />authorizing the connection and use of such equipment. !11 services that <br />have been disconnected, shall not be re- connected until approval is <br />issued by the Inspector. <br />