REGULAR MEETING <br />MARCH 11, 2014 91 <br />4. Part C — Aggregate Materials: Klink Trucking, Inc. <br />5. Part D — Sewer Materials: All covers and frame items: Underground Pipe & Valve, Inc. <br />6. Part D — Sewer Materials: All manhole riser items: American Highway Products <br />7. Part F — Snow Removal Materials: Curved double bevel underbody blade, western pro <br />plus blade and buyer snow dogg blades: American Wire Rope & Sling <br />8. Part F — Snow Removal Materials: All Curved single bevel blades: Underground Pipe & <br />Valve <br />Therefore, Ms. Roos made a motion that the recommendation be accepted and the bid be <br />awarded, in unit bid prices, as outlined above. Mr. Relos seconded the motion, which carried. <br />EXTEND BID AWARD — ONE (1) OR MORE 2013 OR NEWER, VACUUM AIR STREET <br />SWEEPER 2014 SEWERS CAPITAL PRINCIPAL AND INTEREST <br />In a letter to the Board, Mr. Matt Chlebowski, Central Services, requested permission to <br />purchase one (1) additional new vacuum air street sweeper through the March 12, 2013 bid <br />award to Brown Equipment Company, Inc. Mr. Chlebowski included with his letter a copy of the <br />original bid specs that state the successful bidder shall guarantee the bid price for a minimum of <br />twelve (12) months from the bid award date and the City reserves the right to purchase up to two <br />(2) additional sweepers at this price. Mr. Chlebowski noted this purchase is $232,230.00, which <br />is $700.00 less than the original purchase due to not requiring full width vacuum nozzles. Upon a <br />motion by Ms. Roos, seconded by Mr. Relos and carried, the extension of the bid award was <br />approved as outlined above. <br />AWARD QUOTATION — NIMTZ PARKWAY STREETLIGHT REPLACEMENT (AIRPORT <br />TIF) <br />Mr. Paul South, Street Department, advised the Board that on February 28, 2014, quotations <br />were received and opened for the above referenced project. After reviewing those quotations, <br />Mr. South recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, All -Phase Electric Supply, 1385 North Bendix Drive, South Bend, Indiana <br />46628, in the unit amount of $838.00 each. Therefore, Mr. Relos made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. Roos <br />seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 2 — PRIMARY CLARIFIER REHABILITATION AND <br />EQUIPMENT UPGRADES — PROJECT NO. 111 -071 WASTEWATER CAPITAL <br />Mr. Gilot advised that Jacob Klosinski, Environmental Services, has submitted Change Order <br />No. 2 on behalf of L. D. Docsa Associates, Inc., 1605 King Highway, Kalamazoo, Michigan <br />49001, indicating the Contract amount be increased by $11,629.97 for a new Contract sum, <br />including this Change Order, in the amount of $5,086,427.67. Upon a motion made by Ms. Roos, <br />seconded by Mr. Henthorn and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 2 — SOUTH BEND FIRE DEPARTMENT TRAINING <br />CENTER —PROJECT NO. 111 -017 EMS CAPITAL <br />Mr. Gilot advised that Toy Villa, Engineering, has submitted Change Order No. 2 on behalf of <br />Ziolkowski Construction, Inc., 4030 Ralph Jones Drive, South Bend, Indiana 46628, indicating <br />the Contract amount be increased by $51,323.00 for a new Contract sum, including this Change <br />Order, in the amount of $2,693,222.00. Upon a motion made by Ms. Roos, seconded by Mr. <br />Relos and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — VACANT AND ABANDONED HOUSING <br />DEMOLITIONS 1000 HOMES IN 1000 DAYS) <br />Mr, Gilot advised that Toy Villa, Engineering, has submitted Change Order No. 1 on behalf of <br />Jackson Trucking and Excavating, 9067 W 100 North, Kewanna, Indiana 46939, indicating the <br />Contract term be extended by twelve (12) days for a new completion date of July 12, 2014. Ms. <br />Greene noted this increase in time was due solely to the weather conditions. Upon a motion <br />made by Ms. Roos, seconded by Mr. Henthorn and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — VACANT AND ABANDONED HOUSING <br />DEMOLITIONS 1000 HOMES IN 1000 DAYS <br />Mr. Gilot advised that Toy Villa, Engineering, has submitted Change Order No. 1 on behalf of <br />Pelley Excavating, 1990 Progressive Drive, Niles, Michigan 49120, indicating the Contract <br />amount be increased by $800.00 for a new Contract sum, including this Change Order, in the <br />