Laserfiche WebLink
REGULAR MEETING DECEMBER 10. 2013 364 <br />TOTAL AMOUNT BASE BID ITEMS 1 TIIRU 6 $285,000.00 <br />Removal, Management, and Disposal <br />Unit <br />Add per <br />Deduct per <br />3 <br />of Asbestos- containing Floor Tile and <br />Lump <br />Unit Price <br />A <br />Mastic in accordance with Contract <br />l <br />Sum <br />_ <br />Documents and Specifications <br />I Sum <br />$2.50 $_ 5.0.00.00 <br />B <br />Removal, Management, and Disposal <br />Materials from tunnels below and <br />of Asbestos - Containing Material <br />$25.00 <br />$20.00 <br />adjacent to all buildings. <br />4 <br />(Transite) (including materials from <br />1 <br />Lump <br />of Asbestos - containing Floor Tile and <br />Square Feet <br />the inside of any vertical shafts.) in <br />Removal, Management, and Disposal <br />Sum <br />$3.001 <br />$2.00 <br />accordance with Contract Documents <br />L <br />Lump <br />(Transite) with Exterior Metal or <br />and Specifications. <br />Sum <br />$10.00 <br />$57,0.00._0_0 <br />(Transite). <br />Removal, Management, and Disposal <br />$17.00 <br />$115,000.00 <br />of all other Regulated Asbestos <br />Containing Materials (including <br />- <br />5 <br />materials within any pits, basements, <br />I <br />Lump <br />behind walls, vertical ducts, vaults, <br />Sum <br />and chases) in accordance with <br />Contract Documents and <br />Specifications. <br />$11.00 <br />$5,000.00 <br />Asbestos Air Monitoring including all <br />Lump <br />6 <br />sampling. testing, and reportin <br />1 <br />Sum <br />during abatement and clearance. <br />$900.00 <br />$5,000.00 <br />TOTAL AMOUNT BASE BID ITEMS 1 TIIRU 6 $285,000.00 <br />Item <br />ADD Alternate #1 — Removal, <br />Unit <br />Add per <br />Deduct per <br />No. <br />Management, (including all air <br />Unit Price <br />Unit Price <br />A <br />monitoring during tunnel abatement <br />'Lump <br />7 <br />and clearance), and Disposal of <br />I Sum <br />$16 00 <br />$12.00 <br />B <br />Regulated Asbestos- containing <br />Materials from tunnels below and <br />Square beet <br />$25.00 <br />$20.00 <br />adjacent to all buildings. <br />$14.50 <br />$145,100.00 <br />REPLACEMENT Alternate #4A — <br />of Asbestos - containing Floor Tile and <br />Square Feet <br />Removal, Management, and Disposal <br />Mastic <br />$3.001 <br />$2.00 <br />4A of Asbestos - Containing Material <br />L <br />Lump <br />(Transite) with Exterior Metal or <br />of Asbestos - Containing Material <br />Sum <br />Wood Substrate or Siding. <br />(Transite). <br />$17.00 <br />$115,000.00 <br />Item <br />Unit Pricing if Required <br />Unit <br />Add per <br />Deduct per <br />No. <br />_. <br />Unit Price <br />Unit Price <br />A <br />Removal, Management, and Disposal <br />of TSI Pipe Wrap <br />Linear Feet <br />$16 00 <br />$12.00 <br />B <br />Removal, Management, and Disposal <br />of TSI Lank Wrap <br />Square beet <br />$25.00 <br />$20.00 <br />i Removal, Management, and Disposl <br />C <br />of Asbestos - containing Floor Tile and <br />Square Feet <br />Mastic <br />$3.001 <br />$2.00 <br />Removal, Management, and Disposal <br />_ <br />D <br />of Asbestos - Containing Material <br />Square Feet <br />(Transite). <br />$13.00 <br />$8.00 <br />DORE & ASSOCIATES CONTRACTING. INC <br />900 Harry S. Truman Parkway <br />Bay City, Michigan 48706 <br />Bid was signed by: Mr. Arthur M. Dore <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Von - Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />