My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/10/13 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2013
>
12/10/13 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:02:51 PM
Creation date
12/23/2013 9:23:10 AM
Metadata
Fields
Template:
Board of Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING DECEMBER 10. 2013 364 <br />Removal, Management, and Disposal <br />3 <br />of Asbestos -containing Floor Tile and <br />Lump <br />Mastic in accordance with Contract <br />l <br />Sum <br />_ <br />Documents and Specifications <br />$2.50 $_ 5.0.00.00 <br />Removal, Management, and Disposal <br />of Asbestos -Containing Material <br />4 <br />(Transite) (including materials from <br />1 <br />Lump <br />the inside of any vertical shafts.) in <br />Sum <br />accordance with Contract Documents <br />and Specifications. <br />$10.00 <br />$57,000.00 <br />Removal, Management, and Disposal <br />of all other Regulated Asbestos <br />Containing Materials (including <br />- <br />5 <br />materials within any pits, basements, <br />I <br />Lump <br />behind walls, vertical ducts, vaults, <br />Sum <br />and chases) in accordance with <br />Contract Documents and <br />Specifications. <br />$11.00 <br />$5,000.00 <br />Asbestos Air Monitoring including all <br />Lump <br />6 <br />sampling. testing, and reportin <br />1 <br />Sum <br />during abatement and clearance. <br />$900.00 <br />$5,000.00 <br />TOTAL AMOUNT BASE BID ITEMS 1 TIIRU 6 $285,000.00 <br />ADD Alternate #1 — Removal, <br />Management, (including all air <br />monitoring during tunnel abatement <br />'Lump <br />7 <br />and clearance), and Disposal of <br />I Sum <br />Regulated Asbestos -containing <br />Materials from tunnels below and <br />adjacent to all buildings. <br />$14.50 <br />$145,100.00 <br />REPLACEMENT Alternate #4A — <br />Removal, Management, and Disposal <br />Lump <br />4A ofAsbestos-Containing Material <br />L <br />(Transite) with Exterior Metal or <br />Sum <br />Wood Substrate or Siding. <br />$17.00 <br />$115,000.00 <br />Item <br />Unit Pricing if Required <br />Unit <br />Add per <br />Deduct per <br />No. <br />_. <br />Unit Price <br />Unit Price <br />A <br />Removal, Management, and Disposal <br />of TSI Pipe Wrap <br />Linear Feet <br />$16 00 <br />$12.00 <br />B <br />Removal, Management, and Disposal <br />of TSI Lank Wrap$25.00 <br />Square beet <br />$20.00 <br />i Removal, Management, mull) —sposl <br />C <br />of Asbestos -containing Floor Tile and <br />Square Feet <br />Mastic <br />$3.00I <br />$2.00 <br />Removal, Management, and Disposal <br />_ <br />D'. <br />of Asbestos -Containing Material <br />Square Feet <br />(Transite). <br />$13.00 <br />$8.00 <br />DORE & ASSOCIATES CONTRACTING. INC <br />900 Harry S. Truman Parkway <br />Bay City, Michigan 48706 <br />Bid was signed by: Mr. Arthur M. Dore <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Von -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.