Laserfiche WebLink
REGULAR MEETING DECEMBER 10, 2013 365 <br />Five (5 %) Bid Bond was submitted <br />BID: <br />Item <br />llescription <br />Quantity <br />Unit <br />Unit <br />Total <br />No. <br />Management, (including all air <br />Price <br />Price <br />Amount <br />A <br />Removal, Management, and Disposal <br />Linear beet <br />$24.00 $15.00 <br />of ALI, TSI Pipe W rap (including <br />7 <br />and clearance), and Disposal of <br />I <br />materials within any pits, basements, <br />Lump <br />1 <br />vaults and chases) in accordance with <br />Sum <br />Sum <br />Contract Documents and <br />Materials from tunnels below and <br />Specifications(Excluding I tmnels) <br />$362.100.00 <br />Removal, Management, and Disposal <br />- <br />$47,200.00 <br />of ALL TSI'fank Wrap (including <br />REPLACEMENT Alternate #4A — <br />2 <br />materials within any pits, basements, <br />1 <br />Lump <br />vaults and chases) in accordance with <br />Sum <br />of Asbestos- Containing Material <br />I <br />Contract Documents and <br />(Transite) with Exterior Metal or <br />Specifications _ <br />Sum <br />$16,500.00 <br />Removal, Management, and Disposal <br />_ <br />$192, 700.00 <br />3 <br />of Asbestos- containing Floor Tile and <br />Lump <br />Mastic in accordance with Contract <br />1 <br />Sum <br />Documents and Specifications <br />_ <br />S5,000.00 <br />Removal, Management, and Disposal <br />_ <br />- -- <br />of Asbestos - Containing Material <br />4 <br />(Trausite) (including materials from <br />Lump <br />the inside of any vertical shatts.) in <br />1 <br />Sum <br />accordance with Contract Documents <br />and Specifications. <br />_ <br />$53,200.00 <br />Removal, Management, and Disposal <br />of all other Regulated Asbestos <br />Containing Materials (including <br />5 <br />materials within any pits, basements, <br />1 <br />Lump <br />behind walls, vertical ducts, vaults, <br />Sum <br />and chases) in accordance with <br />Contract Documents and <br />Specifications. <br />$10,000.00 <br />Asbestos Air Monitoring including all <br />6 sampling, testing, and reporting 1 <br />Lump <br />j during abatement and clearance.. <br />Sum ! $17300.00 <br />TOTAL AMOUNT BASE BID ITEMS 1 THRU 6 $464,000.00 <br />ADD Alternate #1 — Removal. <br />Item <br />Unit Pricing if Required <br />g � 9 <br />Add per li Deduct per Unit <br />Unit Unit <br />Nu <br />Management, (including all air <br />Price <br />Price <br />A <br />monitoring during tunnel abatement <br />Linear beet <br />$24.00 $15.00 <br />7 <br />and clearance), and Disposal of <br />I <br />Lump <br />Regulated Asbestos- containing <br />Sum <br />Materials from tunnels below and <br />adjacent to all buildings. <br />- <br />$47,200.00 <br />REPLACEMENT Alternate #4A — <br />_ -- <br />Removal, Management, and Disposal <br />4A <br />of Asbestos- Containing Material <br />I <br />Lump <br />(Transite) with Exterior Metal or <br />Sum <br />Wood Substrate or Siding. <br />$192, 700.00 <br />Item <br />Unit Pricing if Required <br />g � 9 <br />Add per li Deduct per Unit <br />Unit Unit <br />Nu <br />Price <br />Price <br />A <br />Removal, Management, and Disposal <br />Linear beet <br />$24.00 $15.00 <br />