My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/10/13 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2013
>
12/10/13 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:02:51 PM
Creation date
12/23/2013 9:23:10 AM
Metadata
Fields
Template:
Board of Public Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING DECEMBER 102013 363 <br />Removal, Management, arid Disposal <br />of all other Regulated Asbesms <br />Containing Materials (including <br />5 <br />materials within any pits, basements, <br />1 <br />p Lum <br />um <br />None <br />behind walls, vertical ducts, vaults, and <br />Stan <br />chases) in accordance with Contract <br />Documents and Specifications. <br />S <br />Asbestos Air Monitoring including all <br />_ <br />6 <br />sampling, testing, and reporting during <br />1 <br />Lump <br />abatement and clearance. <br />Stan <br />$14.700.00 <br />Alternate #1 — Removal, Management, <br />_ <br />7 <br />and Disposal of Regulated Asbestos- <br />Lump <br />containing Materials from tunnels <br />1 <br />Sum <br />below and adjacent to all buildings. <br />$198.900.00 <br />Alternate #2 — Removal, Management, <br />and Disposal of Asbestos -Containing <br />8 <br />Material (Fransite) with Exterior Metal <br />1 <br />Lttmp <br />or Wood Substrate or Siding instead of <br />Sum <br />erforming Iten04. <br />$12,600.00 <br />TOTAL. AMOUNT ITEMS 1 THRLI 8 $584,432.00 <br />I[em <br />No. <br />Unit Pricing if Required <br />Unit <br />Add per <br />Deduct per Unit <br />Unit Price <br />Price <br />A <br />Removal, Management, and Disposal <br />Linear <br />of TSI Pipe Wrap <br />Feet <br />$15.00 <br />$8.40 <br />B <br />_ <br />Removal, Management, and Disposal <br />Square <br />of TSI Tank Wrap <br />Feet <br />$29.00 <br />$17.40 <br />Removal, Management, and Disposal <br />_ <br />C <br />of Asbestos -containing Floor Tile and <br />quay <br />e Squar <br />Mastic — <br />Feet <br />S2.60 <br />$1.56 <br />Removal, Management, and Disposal <br />_ <br />D <br />of Asbestos -Containing Material <br />Square <br />(fransite). <br />Feet <br />$8,60 <br />55.16 <br />ENVIRONMENTAL ASSURANCE COMPANY PVC. <br />440 Hancock Street <br />Indianapolis, Indiana 46222 <br />Bid was signed by: Mr. Ronald Yazel <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United Stales Steel Products or <br />Foundry Products was submitted <br />Five (5%) Bid Bond was submitted <br />BID: <br />Item <br />No <br />- <br />Description <br />Quantity <br />Unit <br />- <br />Unit Price <br />Total <br />Amount <br />Removal, Management, and Disposal <br />_ <br />of ALL TSI Pipe Wrap (including <br />I <br />materials within any pits, basements, <br />I <br />Lump <br />vaults and chases) in accordance with <br />Sum <br />Contract Documents and <br />Specifications (Excluding "funnels) <br />$14X <br />$208,000.00 <br />Removal, Management, and Disposal <br />of ALL TSI Tank Wrap (including <br />2 <br />materials within any pits, basements, <br />Lump <br />vaults mid chases) in accordance with <br />1 <br />Sum <br />Contract Documents and <br />Specifications _ <br />_ <br />_ $25.00 <br />$5,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.