Laserfiche WebLink
REGULAR MEETING SEPTEMBER 24.2013 280 <br />t:pon a motion made by Mr. Mecham, seconded by Mr. Relos and carried, the above bids were <br />referred to the Street Department and Central Services for review and recommendation. <br />APPROVE WAYFINDNG SIGNS — ST. JUDF, CATHOLIC SCHOOL <br />Mr. Gilot stated to accommodate visitors he would move this item up on the agenda. Mr. Steven <br />Donndelinger, St. Jude's Catholic School, informed the Board that they have reduced the number <br />of signs previously requested, based on the Board's request, from twelve (12) to four (4). Mr. <br />Meclrum stated they need to limit these types of signs due to sixty -some schools and churches of <br />this sort. He noted if they all placed multiples signs, as requested by St. Jude's, it would be a <br />traffic hazard; they have been shown to cause accidents because they are a distraction to drivers. <br />Mr. Donndelinger asked the Board if they would allow four (4) signs. Mr. Gilot stated the <br />process is the Board ratifies the traffic engineer's recommendations on traffic signage, and the <br />detail is wider the review of the city engineer by Ordinance. The Board authorizes the city <br />engineer to work out the details. Mr. Mecham stated he approves of the newly designed white <br />lettering on green background signs presented by the petitioners, with the addition of an arrow <br />pointing out the direction to the chureb. He sorted he would only approve three locations of the <br />church's choice. Therefore, upon a motion made by Ms. Roos, seconded by Mr. Mecham and <br />carried, the Board approved the placing of three wayfrnding signs of the design approved by Mr. <br />Mecham, City Engineer, with the petitioner to come back to the Board for approval of the <br />locations they deem appropriate. <br />AWARD QUOTATION — PARKING GARAGE SIGNAGE — PROJECT NO. 113 -016 (MAN <br />STREET GARAGE, ITIGHTON GARAGE. W'AYNE STREET GAIUIGE) <br />Mr. John Engstrom, Engineering, advised the Board that on August 13, 2013, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Engstrom recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, US Signeraflcrs, Inc., 216 Lincoln Way Fast, Osceola, Indiana 46561, in the <br />amount of $50,000.00. Therefore, Mr. Mecham made a motion that the recommendation be <br />accepted and the quotation be awarded as outlined above. Mr. Neal seconded the motion, which <br />carried. <br />APPROVE CHANGE ORDER NO. I — WASTEWATER TREATMENT PLANT DIGESTER <br />NO. 2 UPGRADE AND DIGESTER GAS CLEANING — PROJECT NO. 111 -029 <br />(WASTEWATERO &M /2011 SEWER BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. I on behalf <br />of Grand River Construction, Inc., PO Box 323, 5025 40" Avenue, Hudsonville, Michigan <br />49426, indicating the contract amount be decreased by $1,000.00 for a modified contract sum, <br />including this Change Order, in the amount of $5,597,800.00. Upon a motion made by Mr. <br />Relos, seconded by Mr. Mecham and carried, the Change Order was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — CF,NTURY CENTER WEST <br />ENTRANCE IMPROVEMENTS — PROJECT NO. 112 -067 (DOWNTOWN TIE) <br />Mr. Gilot advised that Mr. 'Joy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Ziolkowski Construction, Inc., 4050 Ralph Jones Drive, South Bend, <br />Indiana 46628, for the above referenced project, indicating a final cost of $161,635.00. Upon a <br />motion made by Mr. Relos, seconded by Ms. Roos and carried, the Project Completion Affidavit <br />was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — MEMORIAL HOSPITAL FACADE — <br />PROJECT NO. 112 -018 (MEDICAL TIE <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Project Completion <br />Affidavit on behalf of IIolladay Construction Group, 227 South Main Street, Suite 200, South <br />Bend, Indiana 46601, for the above referenced project, indicating a final cost of $872,720.00. <br />Upon a motion made by Mr. Relos, seconded by Ms. Roos acrd carried, the Project Completion <br />Affidavit was approved. <br />APPROVE SUBSTANTIAL COMPLETION CERTTFICATE — SKYWAY PLAZA BUILDING <br />WINDOW REPLACEMENT — PROJECT NO. 112 -043 (MEDICAL 'I IF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted the Substantial Completion <br />Certificate on behalf of Gibson - Lewis. LLC, 1001 West l la' Street, Mishawaka, Indiana 46544, <br />for the above referenced project. The date of Substantial Completion is August 31, 2013. Upon a <br />