My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/24/13 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2013
>
09/24/13 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:04:30 PM
Creation date
10/11/2013 8:42:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MLETING <br />SEPTEMBFR 24 2013 279 <br />a 1100 <br />Est. <br />Oty. <br />Item <br />Manufacturer <br />Unit Price <br />t <br />KM8000TEPD <br />K-M Int. <br />$29,705.00 <br />Option# Description Cost Total <br />1 Electric backup heat for indoor use. $3,800.D0 $33,,905.00 <br />BROWN F,OUIPMENT CO INC <br />PO Box 9799 <br />Fort Wayne, Indiana 46899-9799 <br />Bid was signed by: Douglas W. Brown <br />Contractor's Nun -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of united States Steel Products or <br />Foundry Products was submitted <br />Ten percent 10% Bid Bond was submitted <br />BID: <br />Est. <br />Oty <br />Item <br />Manufacturer <br />Unit Price <br />1 <br />I Asphalt Hot Box <br />Spaulding Mfg. <br />$23,356.00 <br />Option# Description Cost Total <br />1 Electric backup heat for indoor use. $1,600.0o S1,600.00 <br />Total Including Option $2, ,956.00 <br />W.A. JONES TRUCK BODIES & EQUIPMENT <br />1171 S. Williams Drive <br />Columbia City, Indiana 46725 <br />Bid was signed by: Denny McIntyre <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility verificatiou, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />Indiana Local Business Preference Claim was submitted <br />Ten percent 10% Bid Bond was submitted <br />I. 2 <br />Est. <br />Oh, <br />Item <br />ManufacturJ$22 <br />Unit Price <br />1 <br />2013 Asphalt Hot Box <br />Falcon <br />, 982.00 <br />Option# Description Cost Total <br />1 -- Electric backup heat for indoor use. $1,960.00 $24,9470D <br />
The URL can be used to link to this page
Your browser does not support the video tag.