My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/24/13 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2013
>
09/24/13 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:04:30 PM
Creation date
10/11/2013 8:42:28 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />SEPTENIBF 224, 2013 278 <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />item <br />- Total <br />Description Quantity, Unit Price <br />No. <br />Amount <br />Removal, Management, and Disposal of <br />1 <br />Lead -based Paint in accordance with <br />I <br />Lump Sum <br />$1300,000.00 <br />Contract Documents and Specifications <br />Lead Monitoring — including all air and <br />2 <br />wipe sampling, testing, and reporting <br />1 <br />Lump Sum $35,000.00 <br />during abatement and clearance. <br />3 <br />Alternate 41 - Encapsulation of Lead- <br />(-501000) Square Foot $0.50 <br />Based Paint in lieu of removal <br />Removal, Management, and Disposal of <br />Regulated Asbestos -containing Materials <br />4 <br />(including materials within pits, tunnels, <br />I <br />Lump Sum <br />$640,000.00 <br />basements, vaults and chases) in <br />accordance with Contract Documents <br />and Specifications <br />Removal, Management, and Disposaf of <br />5 <br />Asbestos -containing Floor Tile and <br />Mastic in accordance with Contract <br />2000 <br />Square Foot <br />$450 <br />Documents and Specifications <br />Asbestos Air Monitoring including all <br />6 <br />sampling, testing, and reporting during <br />1 <br />Lump Sum <br />$25,000.00 <br />abatement and clearance. <br />I U I AL AMU U N I I ISMS 1I H R II 6 $2,000,000.00 <br />It was noted that the acknowledgement for Addendum No. 1 was not included in the sealed bid <br />from Dore & Associates Contracting, Inc. Upon a motion made by Mr. Mecham, seconded by <br />Nor. Relos and carried, the above bids were referred to Community Investment and Engineering <br />for review and recommendation. <br />OPENING OF BIDS — ONE (11, OR MORE- 2013 OR NEWER ASPHALT HOTBOX (2014 <br />STREET DEPARTMENT CAPITAL BUDGET) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the '1'ri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />\MID -STATE, TRUCK EQUIPMENT <br />11020 Allisonville Road <br />Fishers, Indiana 46038 <br />Bid was signed by: Josh Kunze <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted <br />Ten percent 10% Bid Bond was submitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.