Laserfiche WebLink
Plow & bettor 12 hours C $2.00 <br />24.00 <br />7 .00 <br />$78.00 <br />30 man hours @ 44* <br />13.20 <br />56 gallons of gasoline ® .151 <br />8.45 <br />Proportionate cost of lighting <br />51.22 <br />72.87 <br />72.9-7 <br />1 crow bar <br />•30 <br />1 pr boots <br />7.00 <br />- <br />1 toilet <br />5.00 <br />1 pick handle <br />•35 <br />2 pcs marking chalk <br />.2r- <br />4.00 <br />4 pitch forks <br />2 scythes <br />2.50 <br />1 scythe stone <br />.12 <br />100 shovels <br />130.00 <br />2 sledges <br />3.50 <br />2 axes <br />2.60 <br />20 picks <br />25.00 <br />5 pails <br />1.50 <br />3 dippers <br />.60 <br />2 bells mason line <br />•80 <br />1 pad lock <br />.60 <br />6 red flags <br />1.50 <br />8 rakes <br />8-.00 <br />198.27 <br />198.27 <br />TOTAL <br />349.14 <br />Job #4 M. Hutter, supervisor <br />North Side Blvd. <br />12,652 sq yds of street graded and groveled <br />2,666 cu yds of dirt removed <br />1,318 cu yds of gravel dug from pit and spread on street <br />3,027 lin ft of brick curb laid <br />151 men and 13 trucks furnished by Federal Government <br />Lity _cost <br />Proportionate cost,of lighting 51.22 <br />bells mason line <br />pails <br />3 cups <br />125 24" grade Stakes <br />1 push broom <br />1 padlock <br />6 scythes <br />2 scythe stones <br />132 shovels <br />3 axes <br />12 rakes <br />6 mattocks <br />3 sledges <br />1 cross cdt, saw <br />8 lbs nails <br />4 crow bars <br />2 brick hammers <br />1 toilet <br />TOTAL <br />Job A5 0. Bolka, supervisor <br />Pleasent Street, end adjoining streets <br />6,165 cu *ds of dirt removed <br />110 ft culvert built <br />12 water shut -offs repaired <br />14 catch - basins repaired <br />8 manholes repaired <br />4 blocks of streets graded <br />and. e:lleys <br />2.00 <br />1.20 <br />.30 <br />3.10 <br />1.00 <br />.6o <br />10.�� <br />171.60 <br />3.90 <br />12.00 <br />4.68 <br />5.25 <br />3.00 <br />.32 <br />1.20 <br />2.20 <br />5.00 <br />22F,.09 <br />143 men-and 12 trucks furnished by the Federal Government <br />City Cost <br />Plow and Tractor furnished 31 hours 0 $2.00 62.00 <br />31 man hours C 44¢ <br />52 gallons of gasoline @ .151 <br />Proportionate cost of lighting <br />110 ft 12" sever tile <br />16 ft 811 sewer the <br />8 sacks cement <br />1 8" elbow <br />2 red (legs <br />1 padlock <br />2 dippers <br />1 push broom <br />110 shovels <br />20 picks <br />12 rakes <br />3 axes <br />4 pails <br />3 cups <br />3 bells meson line <br />6 mattocks <br />3 sledges <br />19 barricades <br />13.64 <br />7.85 <br />51.22 <br />72.71 <br />656.82 <br />4.40 <br />1.26 <br />.6o <br />.4o <br />1.00 <br />124.30 <br />25.00 <br />12.00 <br />3.90 <br />1.20 <br />.30 <br />1.20 <br />4.6(s <br />4.75 <br />28.50 <br />285.85 <br />TOT AT. <br />51.22 <br />228.00 <br />279.31 <br />62.00 <br />72.71, <br />285.85 <br />2nR <br />