Laserfiche WebLink
'330 <br />(CONTINUED FRO?: PAGE 229) <br />Job #6 Bob-Harris, supervisor <br />Falcon Street <br />3,611 tin ft of rough-grade <br />2,522 lin -f t of sub grade <br />1,373 lin ft of finished graveled street <br />2,175 tin ft of sidewalk graded <br />6 stone cetch- besins built <br />131 men and 12 trucks furnished by the Federal Government <br />30.62 <br />#2 <br />City Cost <br /># <br />274 9,31 <br />Grader furnished 27 hours @ $3.00 <br />X1.00" <br />X1.00 <br />27 man hours ® 44¢ <br />11.95 <br />410.7 <br />39 gallons of gesoline @ .151 <br />5.88 <br />Grand Total <br />Proportionate cost of lighting <br />1.22 <br />69.98 <br />.9 <br />139 shovels <br />190.70 <br />4.00 <br />4 pitch forks <br />110 24" grade stakes <br />2.75 <br />20 picks <br />25.00 <br />6 grub hoes <br />7.50 <br />3 axds <br />3.90 <br />10 rakes <br />10.00 <br />3 sledges _ <br />5.25 <br />i� pails <br />1.20 <br />3 d pper-s <br />.60 <br />3 balls mason line <br />"•20 <br />6 burricedes <br />4.60 <br />6 mattocks <br />• <br />2 scythes <br />2 24 <br />2 scythe stones <br />. <br />2 push brooms <br />2.00 <br />1 red flag <br />•2 <br />2 0.77 <br />26o.77 <br />TOTAL <br />410.75 <br />JRb #7 Bert Grant, supervisor <br />S+. Joseph St., and Donmoyer Avenue <br />2 blocks of streets graded <br />1 block of street graded between curb and pavement <br />4,918 cu yds of dirt removed <br />X148 men and 13 trucks furnished by the Federal Government <br />City Cost <br />Plow and Tractor furnished 152 hours @ $2.00 <br />31.00 <br />31.00 <br />152 man hours ® 44. - <br />6.82 <br />3.22 <br />23 gellons of gasoline @ .151 <br />Proportionate cost of lighting <br />1.51 <br />61.51 <br />150 shovels <br />195.00 <br />30 picks- <br />37.50 <br />12 grub hoes <br />15.00 <br />1 axe <br />1.30 <br />5 pens <br />1=s 50 <br />5 dippers <br />4.00 <br />10 balls mason line <br />.00 <br />2 <br />2.50 <br />2 scythes <br />-1 barricades <br />27.00 <br />100 20 grade @takes <br />2. 5 0 <br />3.6o <br />200 1V" grade stakes <br />1 tool box <br />5.00 <br />6.00 <br />6 rakes <br />1 lock <br />.60 <br />2.20 <br />2 brick hammers <br />9.36 <br />12 mattocks <br />.3 <br />1 crow bar <br />22 3.14 <br />2 .14 <br />TOTAL <br />355-65 <br />55. 5 <br />Recapitulation <br />Job #1 <br />30.62 <br />#2 <br />416.94- <br /># <br />274 9,31 <br /># <br />420.56 <br />#6 <br />410.7 <br />#7 <br />263.1Z - - <br />Grand Total <br />48.36 <br />Hoping this meets with your approval I respectfully submit the same. <br />Commissioner of Streets <br />J. C. Weer <br />Councilmen Fish moved that the report be accepted and placed on file. Councilmen Goetz seconded <br />the motion. <br />. 0.1 <br />•1 <br />• <br />• <br />1 <br />•I <br />